Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Approach Locking not timing out

You are here: Home > Forum > Simulations > Australian Sims > Moss Vale NSW > Approach Locking not timing out

Page 1 of 1

Approach Locking not timing out 29/07/2018 at 14:01 #110511
Splodge
Avatar
716 posts
Online
Can't find anything in the manual about this - I brought a train down through Cootamundra to send it to the junction towards Temora. I didn't have a train order so brought it down to a stand at CA30 with CA42 in the rear left in automatic mode. CA30 won't clear for the junction so I cancelled the route at CA42 which started a 120 second approach locking time out; however at the end of the 2 minutes the message re-appeared and the red signal aspect remained flashing. After 8 minutes the overlap hasn't dropped out either.
There's the right way, the wrong way and the railway.
Log in to reply
Approach Locking not timing out 29/07/2018 at 14:13 #110512
Splodge
Avatar
716 posts
Online
See also MY1 at Medway Jn.
There's the right way, the wrong way and the railway.
Log in to reply
Approach Locking not timing out 30/07/2018 at 14:44 #110564
Mattyq
Avatar
259 posts
Bug reported.

Mantis 21363

Not fat ..... fluffy!! (G Iglesias)
Log in to reply
Approach Locking not timing out 31/07/2018 at 12:04 #110609
Coolah
Avatar
26 posts
See also MV59 at Moss Vale
Log in to reply
The following user said thank you: Mattyq