Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Kings Cross - Hertford Loop signalling workstation - migrating to York ROC

You are here: Home > Forum > Miscellaneous > The real thing (signalling) > Kings Cross - Hertford Loop signalling workstation - migrating to York ROC

Page 2 of 2

Kings Cross - Hertford Loop signalling workstation - migrating to York ROC 10/12/2018 at 19:50 #113892
Peter Bennet
Avatar
5402 posts
I struggled to get Class 50s to over 100mph consistently between Reading and Paddington.

Peter

I identify as half man half biscuit - crumbs!
Log in to reply
Kings Cross - Hertford Loop signalling workstation - migrating to York ROC 11/12/2018 at 14:13 #113910
ajax103
Avatar
1120 posts
Mikehax in post 113874 said:
Having spent the last four nights working the Hertford WS I'm pleased that the transition from KX has gone smoothly and pretty much everything is working as it is supposed to. The only down side being I'm sat at the only pod in this sub ROC with anything in it as the other 6 await the transfer of panels from KX and part of Peterborough - it's like being back in a single manned location.
So at the moment you have the situation where you're managing the Hertford Loop in York ROC as a island basically with Kings Cross still controlling the fringes and you're miles away? Sounds surreal for now until the other Kings Cross panels move.

And any calls from the signals in that area go straight to York ROC not Kings Cross PSB anymore?

The other thing I'm wondering about is when Kings Cross does move, not sure if they're doing it panel by panel - is there any order in which they're going to do that?

As a example do they start with Panel 1 or Panel 5?

Log in to reply
Kings Cross - Hertford Loop signalling workstation - migrating to York ROC 11/12/2018 at 21:19 #113914
Mikehax
Avatar
32 posts
ajax103 in post 113910 said:


So at the moment you have the situation where you're managing the Hertford Loop in York ROC as a island basically with Kings Cross still controlling the fringes and you're miles away? Sounds surreal for now until the other Kings Cross panels move.

And any calls from the signals in that area go straight to York ROC not Kings Cross PSB anymore?

The other thing I'm wondering about is when Kings Cross does move, not sure if they're doing it panel by panel - is there any order in which they're going to do that?

As a example do they start with Panel 1 or Panel 5?
Calls from SPTs and GSMR calls from trains at signals on the workstation come to York ROC.

AFAIK, the plan is for Panels 3, 4 & 5 (re-control only) to migrate next year with Panels 1 and 2 (re-signalling and re-control) moving the following year.

Log in to reply
The following user said thank you: ajax103
Kings Cross - Hertford Loop signalling workstation - migrating to York ROC 12/12/2018 at 10:25 #113920
ajax103
Avatar
1120 posts
So when the likes of Hertford North have to call the signaller as they have to as part of their daily duties, they're actually talking to someone in York?
Log in to reply
Kings Cross - Hertford Loop signalling workstation - migrating to York ROC 12/12/2018 at 13:25 #113922
pedroathome
Avatar
916 posts
Online
ajax103 in post 113920 said:
So when the likes of Hertford North have to call the signaller as they have to as part of their daily duties, they're actually talking to someone in York?
If that is where the signaller is, then yes

Log in to reply
Kings Cross - Hertford Loop signalling workstation - migrating to York ROC 12/12/2018 at 14:05 #113923
Peter Bennet
Avatar
5402 posts
ajax103 in post 113920 said:
So when the likes of Hertford North have to call the signaller as they have to as part of their daily duties, they're actually talking to someone in York?
As soon as you get away from having a local box where the signalman looks out of a window it ceases to be relevant where the box is. They could off-shore it to Bangalore like Virgin Media. Though not quite sure how drivers would take to signalers insisting on reading the script first and then being asked to climb the gantry to check the signal is plugged in and what the lights are doing before S&T can be called.

Peter

I identify as half man half biscuit - crumbs!
Log in to reply
The following users said thank you: ajax103, Stephen Fulcher
Kings Cross - Hertford Loop signalling workstation - migrating to York ROC 12/12/2018 at 15:11 #113925
ajax103
Avatar
1120 posts
Peter Bennet in post 113923 said:
ajax103 in post 113920 said:
So when the likes of Hertford North have to call the signaller as they have to as part of their daily duties, they're actually talking to someone in York?
As soon as you get away from having a local box where the signalman looks out of a window it ceases to be relevant where the box is. They could off-shore it to Bangalore like Virgin Media. Though not quite sure how drivers would take to signalers insisting on reading the script first and then being asked to climb the gantry to check the signal is plugged in and what the lights are doing before S&T can be called.

Peter
hahahahaha!!!

Log in to reply
Kings Cross - Hertford Loop signalling workstation - migrating to York ROC 26/08/2019 at 21:30 #120214
Giantray
Avatar
347 posts
I believe New Barnet to Biggleswade and Royston is now on workstations in York ROC since the Bank Holiday weekend.
Professionalism mean nothing around a bunch of Amateur wannabees!
Log in to reply
Kings Cross - Hertford Loop signalling workstation - migrating to York ROC 26/08/2019 at 21:59 #120215
DaveHarries
Avatar
1285 posts
Giantray in post 120214 said:
I believe New Barnet to Biggleswade and Royston is now on workstations in York ROC since the Bank Holiday weekend.

According to OpenTrainTimes live maps the boundaries between Kings Cross PSB and York ROC are:
- Up Lines: Just prior to Oakleigh Park with K506 & K508 being York ROC's exit signals
- Down Lines: just on the KGX side of Wood Green Tunnel with K475 & K477 being the first signals for York ROC
https://www.opentraintimes.com/maps/signalling/ecm1

The boundary point on OTT's Royston map still has "K" instead of York ROC, as does the Peterborough map so I don't know what the boundaries are on those lines.

HTH,
Dave

Log in to reply
Kings Cross - Hertford Loop signalling workstation - migrating to York ROC 26/08/2019 at 23:28 #120218
Peter Bennet
Avatar
5402 posts
According to OTT's twitter account, the updating is work in progress.

Peter

I identify as half man half biscuit - crumbs!
Log in to reply
The following user said thank you: ajax103
Kings Cross - Hertford Loop signalling workstation - migrating to York ROC 27/08/2019 at 12:49 #120223
John
Avatar
884 posts
The below area will be controlled by LNE South Sub-ROC from 0530 on Monday 26th August.

Wood Green workstation

ECML between New Barnet at 5m 10ch to Hatfield at 18m 20ch.
The Hertford Branch between Palmers Green 6m 0ch to Molewood Tunnel 20m 0ch

Langley workstation

ECML between Hatfield at 18m 20ch to Wymondley at 30m 20ch
The Hertford Branch between Molewood Junction at 20m 0ch to Langley Junction at 28m 0ch.

Hitchin workstation

ECML between Wymondley at 30m 20ch to Biggleswade North at 43m 0ch.
Cambridge Branch from Cambridge Jcn 32m 11ch to Royston at 46m 0ch

Log in to reply
The following users said thank you: BarryM, Giantray