Kings Cross summer 2019 timetable uploaded 26/04/2019 at 22:50 #117863 | |
pedroathome
915 posts |
Peter Bennet in post 117862 said:baitboy2004 in post 117859 said:In theory, they could electrify anywhere, even a branch line on its own should they so wish. The catch is, is it financially worthwhile doing (Cost - Benefit ratio)But could NR upgrade the power supply on the OHLE north of Ely for the class 700s to allow for operation to Kings Lynn to happen?Yes. Log in to reply |
Kings Cross summer 2019 timetable uploaded 15/05/2019 at 06:37 #118312 | |
lqsignal
16 posts |
Haven't had a chance to download and try it yet, but just curious if it includes the class 800 test trains running almost daily between Doncaster Carr IEP depot and Leeds to KX?
Log in to reply |
Kings Cross summer 2019 timetable uploaded 15/05/2019 at 06:55 #118313 | |
lqsignal
16 posts |
baitboy2004 in post 117859 said:But could NR upgrade the power supply on the OHLE north of Ely for the class 700s to allow for operation to Kings Lynn to happen?Anything can be done with enough money. Aside from the OHLE there is the problem of short platforms at Littleport and Watlington. Do the 700s have Selective Door Operation like the entire Turbostar, Electrostar and Desiro families? Log in to reply |
Kings Cross summer 2019 timetable uploaded 15/05/2019 at 10:05 #118317 | |
Peter Bennet
5402 posts |
lqsignal in post 118313 said:Do the 700s have Selective Door Operation like the entire Turbostar, Electrostar and Desiro families?I believe so. For several months after introduction 12-car 700s, entering platform 2 at Finsbury Park, played an erroneous announcement that due to a short platform the rear doors would not open. Peter I identify as half man half biscuit - crumbs! Log in to reply |
Kings Cross summer 2019 timetable uploaded 16/05/2019 at 20:11 #118334 | |
Red For Danger
172 posts |
Peter Bennet in post 118317 said:lqsignal in post 118313 said:Yes - the 700's have selective door opening. I was on a 12 coach 701 that stopped at Knebworth to pick up passengers from a stranded 387 that was halted on the fast line a couple of months ago. Knebworth's platforms will only accommodate 8 car trains and the doors in my carriage towards the rear had 'door not in use' illuminated' by the operating button to prevent you trying to open it as they were not at the platform face.Do the 700s have Selective Door Operation like the entire Turbostar, Electrostar and Desiro families?I believe so. For several months after introduction 12-car 700s, entering platform 2 at Finsbury Park, played an erroneous announcement that due to a short platform the rear doors would not open. Log in to reply |
Kings Cross summer 2019 timetable uploaded 29/05/2019 at 12:35 #118529 | |
M1ch4el
21 posts |
I see on Network Rails WTT CJ01 May-Dec 2019 timetable includes 9U stopping services from Cambridge through to Maidstone East etc. Is this planned for later in the year? If so it would be a good addition to the current tt. Michael MJDM Log in to reply |
Kings Cross summer 2019 timetable uploaded 29/05/2019 at 20:59 #118539 | |
DavidSplett
142 posts |
M1ch4el in post 118529 said:I see on Network Rails WTT CJ01 May-Dec 2019 timetable includes 9U stopping services from Cambridge through to Maidstone East etc. Is this planned for later in the year? If so it would be a good addition to the current tt.I think Cambridge / Maidstone is pencilled in for May 2020. I’m tending to write up-to-date KX timetables for Simsig, and no doubt this will happen nearer the time. Log in to reply The following user said thank you: M1ch4el |
Kings Cross summer 2019 timetable uploaded 30/05/2019 at 05:14 #118546 | |
lqsignal
16 posts |
M1ch4el in post 118529 said:I see on Network Rails WTT CJ01 May-Dec 2019 timetable includes 9U stopping services from Cambridge through to Maidstone East etc. Is this planned for later in the year? If so it would be a good addition to the current tt.9U will mostly replace existing 2C services to/from KX, e.g. 9U35 replaces 2C35. Log in to reply |