CROFTON EAST JN function "CLOSE GATES"

You are here: Home > Forum > Simulations > Released > West Yorkshire > CROFTON EAST JN function "CLOSE GATES"

Page 1 of 1

CROFTON EAST JN function "CLOSE GATES" 11/04/2019 at 16:23 #117464
MEBSWE
Avatar
6 posts
Hello to all from Germany,

I'm not a native speaker but I try to write down here what I found.
But at first a big thank you to the developer from this new releasement from West Yorkshire, it is great for me and I like very much!

Now to the point and I have here a bmp screenshot. I hope this is to see here, it is very big size from simulation. There you can see a green signal and the Crofton gate is open! How is this possible? If a train have leave the sector from gate (was closed all standard), the gate opens after a time automatically. This time is maybe ca. 3 minutes long (the button is continue white until it ends). In this time I give a other route, for example the track above free over the gate. This is everytime accepted, the signal is then green (because the gate button is white). But later the gate is open, maybe it was in the opening process, while I give the new route free. The signal box make nothing against this situation and I think this is a big mistanke? I can make this situation now again and again, it was not only one time.

From my side a question, what is this for a gate and why is the closing process so long?

Thank you and I hope this is a new information for you and not was known.

Best regards from Berlin

Boris


Post has attachments. Log in to view them.
Log in to reply
CROFTON EAST JN function "CLOSE GATES" 11/04/2019 at 16:29 #117465
jc92
Avatar
3685 posts
Have you told him to open the gates then set a route afterwards? I think someone reported this already on another thread.

As to why it takes so long, the crossing keeper also controls another local crossing and has to walk between the two as and when required so he doesn't always immediately close and reopen them.

"We don't stop camborne wednesdays"
Log in to reply
CROFTON EAST JN function "CLOSE GATES" 11/04/2019 at 16:38 #117466
MEBSWE
Avatar
6 posts
jc92 in post 117465 said:
Have you told him to open the gates then set a route afterwards? I think someone reported this already on another thread.

No I did nothing, all is automatic.

As to why it takes so long, the crossing keeper also controls another local crossing and has to walk between the two as and when required so he doesn't always immediately close and reopen them.
Thank you for information.

Log in to reply
CROFTON EAST JN function "CLOSE GATES" 12/04/2019 at 18:02 #117520
DaveHarries
Avatar
1285 posts
jc92 in post 117465 said:
Have you told him to open the gates then set a route afterwards? I think someone reported this already on another thread.

As to why it takes so long, the crossing keeper also controls another local crossing and has to walk between the two as and when required so he doesn't always immediately close and reopen them.

Yes I reported it. I had not told the gate keeper to open the gates either IIRC.

Dave

Log in to reply
CROFTON EAST JN function "CLOSE GATES" 12/04/2019 at 19:40 #117523
Noisynoel
Avatar
989 posts
I'm looking into a different way of doing it
Noisynoel
Log in to reply