Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Clearing Point Violation

You are here: Home > Forum > Simulations > Released > North East Scotland > Clearing Point Violation

Page 1 of 1

Clearing Point Violation 05/05/2019 at 19:19 #118112
Ford
Avatar
27 posts
Can someone explain what this is, and how I might avoid it? I have vaguely established that setting the points before setting the route at Hilton Jnc prevents this from occuring when I send a train to Ladybank - but I'm yet to workout how to avoid getting this when setting a route into the Montrose sidings - even when there's not a train in sight in either direction, I get a 'clearing point violation' - can someone explain? I've not been able to find anything in the manual or forums that really explains this.

Thanks

Log in to reply
Clearing Point Violation 05/05/2019 at 19:25 #118114
Hap
Avatar
1039 posts
Have a wee look at this https://www.SimSig.co.uk/Media/Wiki/%2Fusertrack%2Fmans%2Fnescot%2Fnescot-clearing-points.pdf

Have you got the points set into Montrose number 1 siding before any train has came to a stand at signal MS15?

Points MS11 must remain in the normal position until the train has came to a stand at signal MS15. Give that a try and see what happens.

Craig (HAP)

How to report an issue: www.SimSig.co.uk/Wiki/Show?page=usertrack:reportanissue
Last edited: 05/05/2019 at 19:58 by Hap
Reason: None given

Log in to reply
Clearing Point Violation 05/05/2019 at 19:49 #118115
Steamer
Avatar
3984 posts
Ford in post 118112 said:
Can someone explain what this is, and how I might avoid it? I have vaguely established that setting the points before setting the route at Hilton Jnc prevents this from occuring when I send a train to Ladybank - but I'm yet to workout how to avoid getting this when setting a route into the Montrose sidings - even when there's not a train in sight in either direction, I get a 'clearing point violation' - can someone explain? I've not been able to find anything in the manual or forums that really explains this.

Thanks
At Montrose, you need to wait for an approaching train to come to a stand at the relevant signal before setting the route into the sidings.

On other simulations, you may have come across locations where you have to wait for an overlap to time out before setting a route into sidings- the principle is the same (indeed, clearing points are the Absolute Block equivalent of overlaps).

"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)
Log in to reply
The following user said thank you: Hap
Clearing Point Violation 05/05/2019 at 22:11 #118117
jrr
Avatar
95 posts
An example: Trains terminating at Bedwyn on Westbury cannot be signalled into the siding until the overlap has timed out after the train arrives at Bedwyn.
Log in to reply
Clearing Point Violation 06/05/2019 at 00:29 #118118
TUT
Avatar
532 posts
So in absolute block world the line is divided into sections, with a signal box at the start (signal box A) and a signal box at the end (signal box B). Signal box B will of course be at the start of the next section to signal box C and so on.

The section is the line between the last stop signal controlled from one signal box, and the home signal (the first stop signal) controlled by the next signal box.

In absolute block, signaller A offers the train to signal box B, by sending the appropriate is line clear?

Before signaller B can accept the train, they must make sure the line is clear up to and including the clearing point -- which is defined as the point up to which the line must be clear before a train can be accepted. If the distant signal is a colour light signal, the clearing point is usually 183m (200yd) beyond the home signal. If the distant is a semaphore, the clearing point is extended to a point usually 400m (440yd) beyond the home signal. They must also ensure that all points within the clearing point have been set for the safety of the approaching train, that no conflicting movement has been authorised that will cross or foul the line within the clearing point and that no train has been accepted from another direction that requires a portion of the same line within the clearing point for acceptance,

Once signaller B has accepted that train by acknowledging is line clear they cannot allow the line to be obstructed within the clearing point for that train until the train has been stopped at the home signal or has passed beyond any points or crossings that signaller B wishes to use within the clearing point. This applies unless signaller A sends cancelling (3-5) or the train has failed.

So

Before you the SimSig player send a train from one signal box to the next you have to make sure that the line is clear up to and including the clearing point (183m or 400m beyond the next signal, depending - exact locations can be found in the link hap posted) and that all the points within the clearing point are set for the safety of the train (so make sure a proper route is set all the way for a train, with no trailing points incorrectly set) and that you haven't signalled a train from another direction which also requires a part of the same line to be clear.

And then you cannot obstruct the clearing point and you must maintain a complete 183m/400m portion of line with all points within it correctly set until the train comes to a stand at the next signal. At Montrose, if you set the route into the sidings, you've destroyed the clearing point for the train.

Log in to reply
The following users said thank you: postal, DonRiver, flabberdacks
Clearing Point Violation 06/05/2019 at 19:06 #118129
kbarber
Avatar
1742 posts
TUT in post 118118 said:
So in absolute block world the line is divided into sections, with a signal box at the start (signal box A) and a signal box at the end (signal box B). Signal box B will of course be at the start of the next section to signal box C and so on.

The section is the line between the last stop signal controlled from one signal box, and the home signal (the first stop signal) controlled by the next signal box.

In absolute block, signaller A offers the train to signal box B, by sending the appropriate is line clear?

Before signaller B can accept the train, they must make sure the line is clear up to and including the clearing point -- which is defined as the point up to which the line must be clear before a train can be accepted. If the distant signal is a colour light signal, the clearing point is usually 183m (200yd) beyond the home signal. If the distant is a semaphore, the clearing point is extended to a point usually 400m (440yd) beyond the home signal. They must also ensure that all points within the clearing point have been set for the safety of the approaching train, that no conflicting movement has been authorised that will cross or foul the line within the clearing point and that no train has been accepted from another direction that requires a portion of the same line within the clearing point for acceptance,

Once signaller B has accepted that train by acknowledging is line clear they cannot allow the line to be obstructed within the clearing point for that train until the train has been stopped at the home signal or has passed beyond any points or crossings that signaller B wishes to use within the clearing point. This applies unless signaller A sends cancelling (3-5) or the train has failed.

So

Before you the SimSig player send a train from one signal box to the next you have to make sure that the line is clear up to and including the clearing point (183m or 400m beyond the next signal, depending - exact locations can be found in the link hap posted) and that all the points within the clearing point are set for the safety of the train (so make sure a proper route is set all the way for a train, with no trailing points incorrectly set) and that you haven't signalled a train from another direction which also requires a part of the same line to be clear.

And then you cannot obstruct the clearing point and you must maintain a complete 183m/400m portion of line with all points within it correctly set until the train comes to a stand at the next signal. At Montrose, if you set the route into the sidings, you've destroyed the clearing point for the train.
An excellent explanation, and may well reflect current practice. But back in the day the different companies (and their successor regions) varied in whether they allowed clearing points to be changed after accepting a train and before it came to a stand. The GWR was very strict in that regard; once you accepted something you were locked up until it stopped or passed, unless there was a specific exception in the Signal Box Special Instructions (AKA 'footnotes'). I have a feeling that way of working tended to be used where 4-track lines were paired by direction (such as the GNR), and certainly I've heard of an inspector who was ex-GN challenging a Midland line signalman who swung a junction with a train on the block (in fact, at Finchley Road, the train was almost certainly in the section). It would make sense that where lines are paired by use (such as the Midland or the LNWR), it would be considered aceptable to swing the clearing point - provided the new clearing point was properly unobstructed etc. There was even a provision in the General Appendix, of all places, that if points were to be swung ahead of an approaching train, the signalman must satisfy himself that it was safe to do so, having regard to the position and speed of the approaching train.

Log in to reply
The following users said thank you: flabberdacks, DonRiver, VInce, TUT
Clearing Point Violation 12/05/2019 at 00:05 #118225
Ford
Avatar
27 posts
TUT in post 118118 said:

And then you cannot obstruct the clearing point and you must maintain a complete 183m/400m portion of line with all points within it correctly set until the train comes to a stand at the next signal. At Montrose, if you set the route into the sidings, you've destroyed the clearing point for the train.
Thankyou - that's very clear, (I think!) - so - is it even possible to route a train through to Montrose head-shut siding without causing this 'error'? I've ensured that the track is all clear in both directions, that that the points are set into the sidings and waited for the train to come to a halt at MS15 before setting the route, and the train proceeds, but as soon as it leaves the track section directly behind MS15, I get a violation penalty.

Log in to reply
Clearing Point Violation 12/05/2019 at 10:44 #118227
TUT
Avatar
532 posts
Ford in post 118225 said:
TUT in post 118118 said:

And then you cannot obstruct the clearing point and you must maintain a complete 183m/400m portion of line with all points within it correctly set until the train comes to a stand at the next signal. At Montrose, if you set the route into the sidings, you've destroyed the clearing point for the train.
Thankyou - that's very clear, (I think!) - so - is it even possible to route a train through to Montrose head-shut siding without causing this 'error'? I've ensured that the track is all clear in both directions, that that the points are set into the sidings and waited for the train to come to a halt at MS15 before setting the route, and the train proceeds, but as soon as it leaves the track section directly behind MS15, I get a violation penalty.
You're welcome :)

I thought you might be interested in what a clearing point is in general and what a 'clearing point violation' is supposed to mean.

As to the specific situation at Montrose, if you have a look at the diagram hap linked to, you can see that there is only one possible clearing point and that's with the points leading to the sidings (MS11) normal. In other words you cannot have the points set for the siding when you signal the train up to MS15. You have to wait for the train to come to a stand at MS15 before setting the route into the siding (including moving the points). That should then work.

It's typical for clearing points not to include sidings, so you have to accept a train with the points set away from the sidings and then move the points and clear the signal only when the train is at a stand. I've never done an AB course, so I don't know exactly where that's covered in the rule book, whether the phrase "all points within the clearing point have been set for the safety of the approaching train" covers that or whether it's down to signal box special instructions to define acceptable clearing points for a given box I'm not really sure, I just wanted to give you a bit of background.

Log in to reply
Clearing Point Violation 12/05/2019 at 10:47 #118228
TUT
Avatar
532 posts
kbarber in post 118129 said:
An excellent explanation, and may well reflect current practice. But back in the day the different companies (and their successor regions) varied in whether they allowed clearing points to be changed after accepting a train and before it came to a stand. The GWR was very strict in that regard; once you accepted something you were locked up until it stopped or passed, unless there was a specific exception in the Signal Box Special Instructions (AKA 'footnotes'). I have a feeling that way of working tended to be used where 4-track lines were paired by direction (such as the GNR), and certainly I've heard of an inspector who was ex-GN challenging a Midland line signalman who swung a junction with a train on the block (in fact, at Finchley Road, the train was almost certainly in the section). It would make sense that where lines are paired by use (such as the Midland or the LNWR), it would be considered aceptable to swing the clearing point - provided the new clearing point was properly unobstructed etc. There was even a provision in the General Appendix, of all places, that if points were to be swung ahead of an approaching train, the signalman must satisfy himself that it was safe to do so, having regard to the position and speed of the approaching train.
Really interesting, thank you!

I looked through the rule book, but to be honest, I couldn't find anything explicit about changing the clearing points. It probably is still down to local instructions I would have thought? The rule book doesn't seem (as far as I could find) to explicitly address changing the clearing point from one acceptable clearing point to another acceptable clearing point. But, whatever the weather, a clearing point must be maintained, whether or not it's the same one throughout. And at Montrose, for example, the points can't be set into the sidings when the train is accepted or on the line.

Log in to reply
Clearing Point Violation 12/05/2019 at 11:37 #118229
postal
Avatar
5264 posts
TUT in post 118227 said:
In other words you cannot have the points set for the siding when you signal the train up to MS15. You have to wait for the train to come to a stand at MS15 before setting the route into the siding (including moving the points). That should then work.
My understanding of AB working is sketchy to say the least but unfortunately, in the testing I've done, I don't think it is working correctly. Sim is set up with none of the options checked (mechanical interlocking, Montrose resignalling etc). Halt a train at MS15, set the route forward to MS37 and as soon as the train is fully past MS15 and clears TC TMS4479 a clearing point violation message is generated.

Reported on Mantis 24975 (in the hope that my sketchy understanding has actually identified a bug).

“In life, there is always someone out there, who won’t like you, for whatever reason, don’t let the insecurities in their lives affect yours.” – Rashida Rowe
Last edited: 12/05/2019 at 11:38 by postal
Reason: None given

Log in to reply
The following users said thank you: TUT, Ford
Clearing Point Violation 12/05/2019 at 21:30 #118244
Ford
Avatar
27 posts
TUT in post 118227 said:

...In other words you cannot have the points set for the siding when you signal the train up to MS15. You have to wait for the train to come to a stand at MS15 before setting the route into the siding (including moving the points). That should then work.
Ah - then something is definitely up - my train is stopped at MS15. The violation only happens after I've set the points and the train has passed MS15 into the siding.

Thanks for the background - very enlightening!

Dave

Log in to reply
Clearing Point Violation 12/05/2019 at 22:25 #118247
TUT
Avatar
532 posts
Ford in post 118244 said:
TUT in post 118227 said:

...In other words you cannot have the points set for the siding when you signal the train up to MS15. You have to wait for the train to come to a stand at MS15 before setting the route into the siding (including moving the points). That should then work.
Ah - then something is definitely up - my train is stopped at MS15. The violation only happens after I've set the points and the train has passed MS15 into the siding.

Thanks for the background - very enlightening!

Dave
You're most welcome :)

Sorry for assuming you were doing the wrong thing and not bothering to load up the sim myself and check!

Log in to reply
Clearing Point Violation 13/05/2019 at 10:16 #118255
kbarber
Avatar
1742 posts
TUT in post 118228 said:
kbarber in post 118129 said:
An excellent explanation, and may well reflect current practice. But back in the day the different companies (and their successor regions) varied in whether they allowed clearing points to be changed after accepting a train and before it came to a stand. The GWR was very strict in that regard; once you accepted something you were locked up until it stopped or passed, unless there was a specific exception in the Signal Box Special Instructions (AKA 'footnotes'). I have a feeling that way of working tended to be used where 4-track lines were paired by direction (such as the GNR), and certainly I've heard of an inspector who was ex-GN challenging a Midland line signalman who swung a junction with a train on the block (in fact, at Finchley Road, the train was almost certainly in the section). It would make sense that where lines are paired by use (such as the Midland or the LNWR), it would be considered aceptable to swing the clearing point - provided the new clearing point was properly unobstructed etc. There was even a provision in the General Appendix, of all places, that if points were to be swung ahead of an approaching train, the signalman must satisfy himself that it was safe to do so, having regard to the position and speed of the approaching train.
Really interesting, thank you!

I looked through the rule book, but to be honest, I couldn't find anything explicit about changing the clearing points. It probably is still down to local instructions I would have thought? The rule book doesn't seem (as far as I could find) to explicitly address changing the clearing point from one acceptable clearing point to another acceptable clearing point. But, whatever the weather, a clearing point must be maintained, whether or not it's the same one throughout. And at Montrose, for example, the points can't be set into the sidings when the train is accepted or on the line.
I don't think this sort of detail ever appeared in the Rule Book or in SBSIs. It was down to enforcement of local practice (which, to a degree, emerged from interpretation by the operations management of the railway concerned). So Western lines always required the clearing point to be maintained unchanged (unless specifically authorised in the footnotes) until a train had passed, stopped or been cancelled off; that was how Regulation 4 was interpreted and the interpretation was enforced by the District Inspectors, without any need for published instructions. Of course, given the existence of the GA instruction, Reg 4 could equally be interpreted as meaning you could swing the clearing point; again, such a practice would emerge out of practical necessity and become normal practice as a result of DIs raising no objection when it was done.

For example, at Finchley Road (on the Midland line, just north of Belsize Tunnel), swinging the clearing point was pretty much essential to keep the traffic moving. In the old layout (pre West Hampstead PSB), the Fast and Local lines converged to run through what is now the slow line bore (the goods lines used what is now the fast line bore). It was common (several times an hour in the peak) to have a down train offered - often, indeed, in section - from Carlton Road Junction, that needed to run to the local line (nowadays renamed the slow). Meanwhile, an express would be approaching up the fast, and would of course get proceedings at the junction, althpough the signalman would offer the down road to West Hampstead so there was 'Line Clear' on the block ready. By the time the express passed, the headlights of the down road would usually be visible in the tunnel; at that point the junction would be swung (4 levers - switch diamonds and FPLs as well as the facing points) and the signals cleared. To have stopped the down road at the signal before swinging the junction (plus the time taken for it to start away, on quite a steep gradient) would almost certainly have meant delays to the following train (often a down express).

Of course, with a mechanical frame, those levers could be got across at least as quickly as point machines could have driven the junction over.

But you're absolutely right: subject to the brief period of swinging it, where such is permitted, a clearing point must be maintained until the train has come to a stand, passed or been cancelled off the block. In some cases - and provided it's long enough - a siding will provide an acceptable clearing point (we had that option for up road moves at Kensington South Main, using Warwick Road Sidings - the points into the sidings could be locked both ways, which was probably the key). Again, this sort of thing is rarely set out int he SBSIs, it's a matter of local knowledge - at Junction Road https://signalbox.org/diagrams.php?id=706 it was possible to lock 19 points into the down reception both ways, but not permitted to use it for a clearing point - presumably because it was worked 'No block' (effectively a siding) and Upper Holloway could have backed something in that would have infringed the clearing point.

Last edited: 13/05/2019 at 10:29 by kbarber
Reason: None given

Log in to reply
The following user said thank you: TUT
Clearing Point Violation 05/04/2020 at 19:04 #125406
lazzer
Avatar
634 posts
I was just reading this post again, and I remember that the other day I was having CPVs at Montrose when setting main signal routes. I didn't save the game, but I just started up a new game with no TT to see if I could replicate it.

Setting an UP route from MS15 to US12 results in a CPV at MS30 - a signal in the DOWN direction. Similarly, setting a DOWN route from US5 to MS30 results in a CPV at signal US12 on the UP. I'm playing with Mechanical Interlocking OFF, and no other routes are set in the Montrose area when I set the ones I just mentioned.

Is this deliberate behaviour, and if so ... why? I've read the manual, and seen the PDF of all the clearing points, but I don't think it's because I'm violating them.

I added a loco into the sim to run round the Montrose area, and even with it stood at signals MS15 and US5 I still got the CPVs when setting routes from both. I also ran the loco down to Inverkeilor to reverse onto the down line. I set the route from IK18 to IK11 and received a CPV for IK6. Similarly, reversing at Craigo from CO4 to C1O4 gives a CPV for CO6.

So the question is - is it me, or is it the sim? I don't recall seeing anything on the forum about this problem for anyone else.

Log in to reply
Clearing Point Violation 05/04/2020 at 20:04 #125408
bill_gensheet
Avatar
1413 posts
Seems odd, also if the first route you set in a new sim is MS15 to US12, this is not a CPV.
After getting CPV for US5 to MS30, then MS15 to US12 is a CPV.

Log in to reply
Clearing Point Violation 05/04/2020 at 20:28 #125409
lazzer
Avatar
634 posts
bill_gensheet in post 125408 said:
Seems odd, also if the first route you set in a new sim is MS15 to US12, this is not a CPV.
After getting CPV for US5 to MS30, then MS15 to US12 is a CPV.
It is quite weird ...

Log in to reply
Clearing Point Violation 13/05/2020 at 22:30 #126771
Albert
Avatar
1315 posts
Can confirm I just had those violations too in a multiplayer game, looks like a recently introduced bug (maybe with the last sim update?) as there would've been mention of them further up in the thread if this bug had existed when NEScot came out.
AJP in games
Log in to reply
Clearing Point Violation 29/05/2020 at 15:35 #127207
grahamj42
Avatar
130 posts
Albert in post 126771 said:
Can confirm I just had those violations too in a multiplayer game, looks like a recently introduced bug (maybe with the last sim update?) as there would've been mention of them further up in the thread if this bug had existed when NEScot came out.
Reversing the crossover at Laurencekirk generates a CP violation at both homes.

I agree with Albert, that it looks like something has broken over time. Steamer opened Mantis 30608 the other day for similar problems at Usan.

Log in to reply
Clearing Point Violation 27/03/2022 at 16:02 #145873
9pN1SEAp
Avatar
1180 posts
Hi Peter,

A signaller on my MP got the message "Clearing Point Violation at Laurenckirk 20" (sic) - the SB name is spelt wrongly in the message.

Thanks
Jamie

Jamie S (JAMS)
Log in to reply
Clearing Point Violation 27/03/2022 at 20:55 #145887
peterb
Avatar
452 posts
Peter, please can you confirm if CPVs should only occur when the 'mechanical' option is ticked?
Log in to reply
Clearing Point Violation 27/03/2022 at 21:49 #145888
Steamer
Avatar
3984 posts
peterb in post 145887 said:
Peter, please can you confirm if CPVs should only occur when the 'mechanical' option is ticked?
Per the manual, the relevant TCs must always be clear and no conflicting routes set. Mechanical mode also requires any points to be set correctly.

"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)
Log in to reply