Platform 2 Southport too short 14/05/2019 at 20:23 #118291
valenta43002
Avatar
43 posts
I’ve found that when 2 trains are in platform 2 at the same time the second train over hangs the signal and blocks platform 3, is this a bug or a timetable issue?
To get around it I’ve had to shunt the train booked to stable in the platform during the day into the wall siding. Anyone else found this problem on the ordinary 2015 timetable?

Log in to reply
Platform 2 Southport too short 14/05/2019 at 20:31 #118294
Edgemaster
Avatar
332 posts
Could you confirm which trains please?

The platform there is a bit tight for two units, so trains may need timetabling with exact stopping positions to get them to draw all the way up.

Twitter
Log in to reply
Platform 2 Southport too short 14/05/2019 at 20:47 #118295
valenta43002
Avatar
43 posts
It’s happened from 2S14 which arrives and splits, then each one that goes on top of the remaining part overhang too .
Log in to reply
Platform 2 Southport too short 14/05/2019 at 20:54 #118296
Edgemaster
Avatar
332 posts
Hmm, we had seen this in testing, but it had been fixed. Would it be possible to attach a savegame please from when this is happening?
Twitter
Log in to reply
Platform 2 Southport too short 14/05/2019 at 20:57 #118297
valenta43002
Avatar
43 posts
Just started a new one now but n top speed, will do a save as soon it happens
Log in to reply
Platform 2 Southport too short 14/05/2019 at 21:04 #118298
Edgemaster
Avatar
332 posts
Thanks, I'm doing the same to try and reproduce.
Twitter
Log in to reply
Platform 2 Southport too short 14/05/2019 at 21:32 #118299
valenta43002
Avatar
43 posts
I have replicated it, Atachement one is just before. number two is with the train overhanging
Post has attachments. Log in to view them.
Log in to reply
The following user said thank you: Edgemaster
Platform 2 Southport too short 14/05/2019 at 21:38 #118300
Edgemaster
Avatar
332 posts
Hmm, odd. That train went in without trouble in my run.

Could you double check the 1.ssg file please, it appears to be empty.

Reopened mantis Mantis 0022541.

Twitter
Last edited: 14/05/2019 at 21:48 by Edgemaster
Reason: None given

Log in to reply
Platform 2 Southport too short 14/05/2019 at 22:55 #118303
Edgemaster
Avatar
332 posts
Just managed to reproduce this from my own save, reloaded from earlier, train seems to be stopping about 67m short of the buffers in this case! Seems to be rather inconsistent as to whether it goes all the way to the end.
Twitter
Log in to reply
Platform 2 Southport too short 14/05/2019 at 23:28 #118306
jc92
Avatar
3690 posts
Online
Edgemaster in post 118303 said:
Just managed to reproduce this from my own save, reloaded from earlier, train seems to be stopping about 67m short of the buffers in this case! Seems to be rather inconsistent as to whether it goes all the way to the end.
Sounds like the old issue with brighton P3

"We don't stop camborne wednesdays"
Log in to reply
Platform 2 Southport too short 15/05/2019 at 00:51 #118310
headshot119
Avatar
4869 posts
With thanks to valenta43002 we've established how to reproduce the issue. It only occurs if you save and reload the simulation after 2S14 has entered.

Fixing it on the other hand is proving more difficult. Watch this space.

"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Log in to reply
Platform 2 Southport too short 01/06/2019 at 03:11 #118583
headshot119
Avatar
4869 posts
A fix has been applied to the timetable to prevent this issue from happening. It will be available on the update server by the time the UK wakes up in the morning.
"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Log in to reply