Trailing crossover at Peckham Rye 22/07/2019 at 20:14 #119566 | |
TUT
532 posts |
Does anybody happen to know when the trailing crossover at Peckham Rye (South London Line) was put in (and taken out??) It is shown on this map: http://carto.metro.free.fr/cartes/metro-tram-london/ But is absent from both eras of the London Bridge ASC sim and from the OpenTrainTimes map: https://www.opentraintimes.com/maps/signalling/vir1#LINK_2 Which makes me think it could have been installed after 2014 and lifted before 2019. A very short life, so I'm wondering what the real story is. Log in to reply |
Trailing crossover at Peckham Rye 22/07/2019 at 20:47 #119567 | |
GeoffM
6376 posts |
It looks like it was taken out around 2012, according to Google Earth's imagery. Panel photos in the signalbox indicate it was clipped and padlocked at the time the photo was taken in 2008 - no signalled moves, and no ground frame. I don't know when it was installed.
SimSig Boss Last edited: 22/07/2019 at 22:09 by GeoffM Reason: Clarification Log in to reply The following user said thank you: TUT |
Trailing crossover at Peckham Rye 23/07/2019 at 07:55 #119573 | |
Jan
906 posts |
It's already appearing in the plans for the original London Bridge PSB resignalling, and is shown as being clipped and padlocked even back then.
Two million people attempt to use Birmingham's magnificent rail network every year, with just over a million of them managing to get further than Smethwick. Log in to reply The following user said thank you: TUT |
Trailing crossover at Peckham Rye 23/07/2019 at 09:12 #119575 | |
9pN1SEAp
1180 posts |
The station platforms were reconstructed in 1961 when at the same time a depot at Peckham Rye Jn and coal sidings to the East of the station were taken up[1]. So my guess is that the crossover would have been taken out of use then or sometime surely after? Thanks Jamie [1]. London Railway Atlas, 4th Ed. (Highly recommended for London rail information) Jamie S (JAMS) Log in to reply |
Trailing crossover at Peckham Rye 23/07/2019 at 09:51 #119576 | |
Noisynoel
989 posts |
Jan in post 119573 said:It's already appearing in the plans for the original London Bridge PSB resignalling, and is shown as being clipped and padlocked even back then.It was not a motorised crossover and was clipped and padlocked unless required for engineering works or emergencies in which case the P-Way had to unclip them and manually bar them over. There are/were several around the kent area including kidbrooke and Charlton. Noisynoel Log in to reply The following users said thank you: Guts, TUT |
Trailing crossover at Peckham Rye 23/07/2019 at 14:24 #119579 | |
TUT
532 posts |
Really glad I asked now, thanks!
Log in to reply |