Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Who's Online

Person82, 442s3, andi, mh1978muc, jem771, GeoffM, geswedey (7 users seen recently)

Edgeley No. 2 to Stockport No. 1 down slow — train on line stuck

You are here: Home > Forum > Simulations > Released > Stockport > Edgeley No. 2 to Stockport No. 1 down slow — train on line stuck

Page 1 of 1

Edgeley No. 2 to Stockport No. 1 down slow — train on line stuck 18/12/2019 at 20:38 #122335
Muzer
Avatar
718 posts
I'm not entirely sure how I managed this but I've been playing the Stockport sim and have it stuck in a funny state. Edgeley No. 2 to Stockport No. 1 on the down slow is stuck to "train on line" when there isn't a train on the line! This is preventing me swinging across a train from the down fast back to the down slow (to get around a track circuit failure). Save attached.
Post has attachments. Log in to view them.
Log in to reply
Edgeley No. 2 to Stockport No. 1 down slow — train on line stuck 18/12/2019 at 20:56 #122336
Steamer
Avatar
3984 posts
What state was it in before 6E82 approached? The TC on the Down Slow that 6E82 is occupying extends through the block section, so I'm wondering if that's preventing Train Out of Section being sent.
"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)
Log in to reply
Edgeley No. 2 to Stockport No. 1 down slow — train on line stuck 18/12/2019 at 20:59 #122337
pedroathome
Avatar
915 posts
Agreed its an issue

Looks to be if a train proceeds along the Slow Line, while the overlap is still issued, the section becomes occupied again (All be it, the track circuit with points reversed), not then requesting arrived.

I will look into this over the weekend

James

====Edit Below====

Mantis 0028739 Applies

Out of interest, as a follow up question, did you have a train going along the Up Slow just before you routed this train onto the fast?

Last edited: 18/12/2019 at 21:01 by pedroathome
Reason: None given

Log in to reply
Edgeley No. 2 to Stockport No. 1 down slow — train on line stuck 18/12/2019 at 22:44 #122339
Muzer
Avatar
718 posts
pedroathome in post 122337 said:
Agreed its an issue

Looks to be if a train proceeds along the Slow Line, while the overlap is still issued, the section becomes occupied again (All be it, the track circuit with points reversed), not then requesting arrived.

I will look into this over the weekend

James

====Edit Below====

Mantis 0028739 Applies

Out of interest, as a follow up question, did you have a train going along the Up Slow just before you routed this train onto the fast?
The up slow or the down slow? There was a train in the down goods overhanging the loop (TC T940 occupied) so I couldn't send "train arrived" for the down slow; thanks to delays in getting the loco coupled caused by that track circuit failure, I wasn't able to get that overhanging train off until well after 6E82 was stopped at ST1 signal 104. I sent this guy onto the down fast forgetting that the TCF prevented me from sending him into his booked platform 3, hoping to get him out of the way quickly.

Last edited: 18/12/2019 at 22:46 by Muzer
Reason: None given

Log in to reply
Edgeley No. 2 to Stockport No. 1 down slow — train on line stuck 18/12/2019 at 23:48 #122340
pedroathome
Avatar
915 posts
Muzer in post 122339 said:
pedroathome in post 122337 said:
Agreed its an issue

Looks to be if a train proceeds along the Slow Line, while the overlap is still issued, the section becomes occupied again (All be it, the track circuit with points reversed), not then requesting arrived.

I will look into this over the weekend

James

====Edit Below====

Mantis 0028739 Applies

Out of interest, as a follow up question, did you have a train going along the Up Slow just before you routed this train onto the fast?
The up slow or the down slow? There was a train in the down goods overhanging the loop (TC T940 occupied) so I couldn't send "train arrived" for the down slow; thanks to delays in getting the loco coupled caused by that track circuit failure, I wasn't able to get that overhanging train off until well after 6E82 was stopped at ST1 signal 104. I sent this guy onto the down fast forgetting that the TCF prevented me from sending him into his booked platform 3, hoping to get him out of the way quickly.
Sorry, Yes, I do mean the Down Slow. If it is what I think it is, and not a second issue, I have resolved the issue. I should have an update available once this has been tested.

James

Log in to reply