Swindon A & B IECC - SWINDID 130220 28/04/2020 at 04:38 #126389
Airvan00
Avatar
129 posts
I have downloaded the timetable ( Swindon A & B IECC - SWINDID 130220)


I appear to be missing something there are no rules or decisions in this timetable, although a number of trains are programmed to enter at the same time with identical running times, for example 6 trains enter at Kennnington Jn at 08:34. and they all try to run.

Is it possible to download the rules or decisions? or is my file corrupted?

Log in to reply
Swindon A & B IECC - SWINDID 130220 28/04/2020 at 09:42 #126393
y10g9
Avatar
895 posts
I have just downloaded and looked at the V1.2 of the TT, and there are definitely no rules or decisions contained in the timetable file.

Rules for a long time are now saved inside the WTT file so this suggests that there were no rules or decisions created before this version of the WTT file was uploaded to the server

Log in to reply
The following user said thank you: Airvan00
Swindon A & B IECC - SWINDID 130220 29/04/2020 at 07:55 #126416
Chrisrail
Avatar
384 posts
I will have a look at it and update, they should all have been done and in there
Log in to reply
The following user said thank you: Airvan00
Swindon A & B IECC - SWINDID 130220 30/04/2020 at 12:58 #126446
Chrisrail
Avatar
384 posts
RULES AMENDED / ADDED sent for approval and upload.
Thank you for the feedback

Log in to reply
The following users said thank you: Airvan00, bossman
Swindon A & B IECC - SWINDID 130220 04/05/2020 at 07:56 #126531
Chromatix
Avatar
190 posts
I'm trying to run the amended version of the timetable. However, right from the start, there is ARS trouble in the Didcot East Jn and Moreton Cutting Jn area.

4O33 and following trains using the Avoiding line fail to set the route segment across Didcot East Jn, but do set it across Moreton Cutting Jn, leaving a gap that I have to fill manually. I can't see what the difference here is versus other TTs that do work, except that there is no (minor) entry for Moreton Cutting Jn. The timetable validates just fine without the latter.

The other problem is exposed by 1C38, which changes from the Down Relief line to the Down Main at Moreton Cutting Jn. Again there is nothing obvious wrong with the timetable entries, but the route across the junction is not set by ARS even though the following route segment is, leaving a gap to fill manually.

I suspect a problem with the sim's ARS handling...

Log in to reply
Swindon A & B IECC - SWINDID 130220 04/05/2020 at 12:23 #126533
Chrisrail
Avatar
384 posts
Thanks for the Feedback, I have been looking at this and will try some other variations. I think that it maybe a conflict of some kind between the current layout and ARS programming and the Sim version
Log in to reply
Swindon A & B IECC - SWINDID 130220 04/05/2020 at 12:55 #126534
Steamer
Avatar
3985 posts
Chrisrail in post 126533 said:
Thanks for the Feedback, I have been looking at this and will try some other variations. I think that it maybe a conflict of some kind between the current layout and ARS programming and the Sim version
Make sure you're validating the timetable when editing it (there's an option in F3 to do it by default when you close the editor), this should flag any invalid path/line code combinations. It's possible that the combination required by the simulation doesn't match what the WTT provides.

"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)
Log in to reply
Swindon A & B IECC - SWINDID 130220 06/05/2020 at 15:35 #126576
hotwellian
Avatar
211 posts
It would appear that problems are created by the omission of Moreton Cutting Jn from timetables. This applies to up trains using the AL, also with down trains transferring from ML to AL or P3 Didcot. The latter is caused by not having the transfer to RL @ Moreton Cutting rather than Didoct east. So the TTs for the latter should read Moreton Cutting Jn ML->RL then Didoct East RL->RL or RL-> AL as appropriate.
Log in to reply
Swindon A & B IECC - SWINDID 130220 07/05/2020 at 09:02 #126581
Chrisrail
Avatar
384 posts
hotwellian in post 126576 said:
It would appear that problems are created by the omission of Moreton Cutting Jn from timetables. This applies to up trains using the AL, also with down trains transferring from ML to AL or P3 Didcot. The latter is caused by not having the transfer to RL @ Moreton Cutting rather than Didoct east. So the TTs for the latter should read Moreton Cutting Jn ML->RL then Didoct East RL->RL or RL-> AL as appropriate.
When I get 5 minutes I will have a look. Thanks for the feedback

Log in to reply
The following user said thank you: hotwellian
Swindon A & B IECC - SWINDID 130220 09/05/2020 at 11:17 #126651
Chromatix
Avatar
190 posts
That explains the eastbound problem. However, there was also a problem with a westbound train, which didn't seem to have any missing TT entries. Any theories there?
Log in to reply
Swindon A & B IECC - SWINDID 130220 25/10/2020 at 15:04 #133324
headshot119
Avatar
4869 posts
Moderator Note One off topic post removed to this thread.
"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer