Page 2 of 2
WCML Covid Timetables, Crewe Basford Hall- Watford Jn 14/05/2020 at 09:45 #126780 | |
Chrisrail
384 posts |
braders_97 in post 126777 said:Going to run the rest of it today will give you a shout if I find anything thanks for your hard work I tried making a timetable for bhm and just gave up hahaThank you Braders 97 for the feedback, I look forward to it. New St can be a nightmare at times ( You want to be in the PSB when things go Belly up). I am currently doing a Wembley Mainline to fit in with the others which is throwing up tweaks that are needed in the others. Tweaks so far, these will all be uploaded later in the week but they are here if anyone wants to make manual changes till release. WCML Covid Timetables Staffordshire v1.9 Wolverhampton v1.8 5B54 / 1B54 is a 221/10 vice 390/11 New Street v1.9 1B54 is a 221/10 vice 390/11 2P99 clash in P8/8A/ 8B rectified with shunt move Coventry v1.9 1B54 is a 221/10 vice 390/11 Rugby North v1.9 6U28 being looked at Rugby Central v1.8 1B54 is a 221/10 vice 390/11 Rugby South v1.8 1B54 is a 221/10 vice 390/11 Regards Chris Log in to reply The following user said thank you: braders_97 |
WCML Covid Timetables, Crewe Basford Hall- Watford Jn 14/05/2020 at 12:22 #126788 | |
braders_97
31 posts |
Hi Chris 5G55 new street to soho lmd the yard movement is wrong its ns 319 5G55 won't move otherwise instead of ns331 and 5O00 is missing a timing point at the yard its missing NS331 to change direction 5U02 is also missing ns331 5P01 maybe if you could look at all the stock movement from Soho. 5I982 is sat in 2b 1O04 needs to get into 2a but 5I981 arrives before 1O04 used platform 1A for 1O04 instead
Last edited: 14/05/2020 at 13:59 by braders_97 Reason: None given Log in to reply |
WCML Covid Timetables, Crewe Basford Hall- Watford Jn 14/05/2020 at 19:34 #126815 | |
Chrisrail
384 posts |
braders_97 in post 126788 said:Hi Chris 5G55 new street to soho lmd the yard movement is wrong its ns 319 5G55 won't move otherwise instead of ns331 and 5O00 is missing a timing point at the yard its missing NS331 to change direction 5U02 is also missing ns331 5P01 maybe if you could look at all the stock movement from Soho. 5I982 is sat in 2b 1O04 needs to get into 2a but 5I981 arrives before 1O04 used platform 1A for 1O04 insteadCheers Braders 97 looks like a quiet day tomorrow is gone by the wayside. Diagrams from WMR are the ones used on the day including depot diagrams !!!!! Log in to reply |
WCML Covid Timetables, Crewe Basford Hall- Watford Jn 14/05/2020 at 20:51 #126823 | |
braders_97
31 posts |
Im about 9 and half hours in at the moment will run another chunk tomorrow happy to help where i can then can move on to Wolverhampton and Coventry and will report back if there's any issues
Log in to reply |
WCML Covid Timetables, Crewe Basford Hall- Watford Jn 15/05/2020 at 08:17 #126825 | |
Chrisrail
384 posts |
braders_97 in post 126823 said:Im about 9 and half hours in at the moment will run another chunk tomorrow happy to help where i can then can move on to Wolverhampton and Coventry and will report back if there's any issuesAnd then you have Wembley Mainline. Many thanks for the feeback Chris Log in to reply |
WCML Covid Timetables, Crewe Basford Hall- Watford Jn 15/05/2020 at 11:48 #126826 | |
braders_97
31 posts |
Ive not got that one
Log in to reply |
WCML Covid Timetables, Crewe Basford Hall- Watford Jn 28/08/2020 at 02:58 #131074 | |
UKTrainMan
1803 posts |
Chrisrail, with regards to the Staffordshire "230420 COVID" timetable the 95m NT 331/1s do not fit ('track circuit overhang' ) in the timetabled 90m Platform 3 at SOT. They don't even seem to fit if reduced to 90m (the platform length shown in the manual), but do just about fit if reduced to 89m. Am I actually supposed to replatform them into 1 or more likely 2, or? If so, could I suggest a brief mention in the timetable description? Meanwhile, the relevant Network Rail Sectional Appendixes going back as far as December 2012 list SOT Bay Platform 3 as 88m?!! Also, across all "230420 COVID" timetables from Rugby South through to Staffordshire, the "(1) - DB - 325 x 3 - 234m" train type is set to 156m (2 units) rather than 234m (3 units). This affects 1F04 and 1A97 which are both described as "DB - 325 x 3 - 234m". Looks like this is also the same situation on Wembley Mainline as well. Any views and / or opinions expressed by myself are from me personally and do not represent those of any company I either work for or am a consultant for. Last edited: 28/08/2020 at 03:02 by UKTrainMan Reason: None given Log in to reply |
WCML Covid Timetables, Crewe Basford Hall- Watford Jn 28/08/2020 at 10:11 #131080 | |
Splodge
719 posts |
331/1's definitely don't fit in the bay there. What would happen is a route into 1 or 2 and a shunt into the Viaduct siding - but I don't think it's ever been a timetabled move, it's just done on the fly. Less of an issue now as we don't have any of the /1s in the north west, but for a while pre-COVID we ran Sunday services with a mix of /0s and /1s and the instruction was that all arrivals would do the Viaduct Siding shunt rather than risk a four car being put in the bay. There's the right way, the wrong way and the railway. Log in to reply The following user said thank you: UKTrainMan |
WCML Covid Timetables, Crewe Basford Hall- Watford Jn 28/08/2020 at 22:45 #131091 | |
UKTrainMan
1803 posts |
Thank you very much indeed, Splodge, for your reply and recommendation regarding this. As a temporary solution I've removed the platform numbers at SOT for all of the Class 331 workings and will as you recommend shunt them into the unused Viaduct Siding until nearer their SOT departure time. Much appreciated! Any views and / or opinions expressed by myself are from me personally and do not represent those of any company I either work for or am a consultant for. Log in to reply |
WCML Covid Timetables, Crewe Basford Hall- Watford Jn 29/08/2020 at 11:40 #131096 | |
Chrisrail
384 posts |
Thanks for the comments. Now I am about to start a few days off I will try and have a look at them.
Log in to reply |
WCML Covid Timetables, Crewe Basford Hall- Watford Jn 14/09/2020 at 19:44 #131528 | |
9pN1SEAp
1180 posts |
Champs450007 in post 126544 said:Hi Chris, at the start of the timetable on Rugby South 2N73 seeds at STK5192 instead of what I presume is STK5191. The train is on Euston - Northampton but seeds on the up line :). No other issues to report just yet.This should seed at TK5185, not 5191 which is after the first calling point Cheddington. Thanks Jamie Jamie S (JAMS) Log in to reply |
WCML Covid Timetables, Crewe Basford Hall- Watford Jn 18/09/2020 at 10:42 #132582 | |
Chrisrail
384 posts |
Many Thanks
Log in to reply |