Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Summer 1991 timetable

You are here: Home > Forum > Simulations > Timetables > West Hampstead > Summer 1991 timetable

Page 1 of 2

Summer 1991 timetable 20/11/2020 at 21:57 #134005
KymriskaDraken
Avatar
963 posts
Version 2 of Pascal's 1991 timetable has just been uploaded to the Downloads section and should be available to download shortly.

The timetable now has 1049 trains, with many extra workings compared with the original version. These include OHLE wiring trains, a battery loco working, and two football charter trains.

There are fuller timetable notes on the General tab of the tt. Please have a read through these.

If you spot any errors, or have a query, please let us know on this thread.

Kev

Log in to reply
The following users said thank you: sunocske, 58050, flabberdacks, Mikhail
Summer 1991 timetable 21/11/2020 at 00:54 #134009
58050
Avatar
2659 posts
One thing you'll need to keep an eye out for is where the OLE train is working as there are 16 different variations as to where it could work. This will mean either crossing all trains on the FL to the SL or visa versa during the early hours subject to what the decision picks for 2Z99 to waork. The battery units train works on the OLE between Camden tunnel & Moorgate overnight. The battery units were converted ex BR Cl.501 DC units off the Watford Jn to Euston services & were converted to run off batteries. A couple of sets were allocated to Cricklewood TMD from when the Bed-Pan line was electrified & were withdrawn from service in the early 1990s. As a result the night shift should now be a bit more challenging.
Log in to reply
The following user said thank you: sunocske
Summer 1991 timetable 21/11/2020 at 05:23 #134013
swiftaw
Avatar
271 posts
KymriskaDraken in post 134005 said:
Version 2 of Pascal's 1991 timetable has just been uploaded to the Downloads section and should be available to download shortly.

The timetable now has 1049 trains, with many extra workings compared with the original version. These include OHLE wiring trains, a battery loco working, and two football charter trains.

There are fuller timetable notes on the General tab of the tt. Please have a read through these.

If you spot any errors, or have a query, please let us know on this thread.

Kev
Dont see it yet, but looking forward to it.

Log in to reply
Summer 1991 timetable 23/11/2020 at 18:25 #134096
Table 52
Avatar
37 posts
Really looking forward to this, the original version of the TT was a great playthrough. Any ideas how long a TT takes from submission to approval?
Log in to reply
The following users said thank you: Trainfan344, KymriskaDraken
Summer 1991 timetable 26/11/2020 at 10:02 #134156
sunocske
Avatar
121 posts
Is it still pending?
Log in to reply
Summer 1991 timetable 26/11/2020 at 12:12 #134157
KymriskaDraken
Avatar
963 posts
sunocske in post 134156 said:
Is it still pending?
Yes, still waiting on moderator approval.

Kev

Log in to reply
Summer 1991 timetable 26/11/2020 at 12:53 #134158
sunocske
Avatar
121 posts
OK, I'll try to wait patiently (but it's just so hard... I love Pascal's timetables, they are always keeping you on your toes)
Log in to reply
The following user said thank you: KymriskaDraken
Summer 1991 timetable 26/11/2020 at 14:10 #134159
58050
Avatar
2659 posts
sunocske in post 134158 said:
OK, I'll try to wait patiently (but it's just so hard... I love Pascal's timetables, they are always keeping you on your toes) :)
PM me your e-mail details & I'll send you the new version of the TT. Save you waiting indefinately for it to appear in the downloads section.

Log in to reply
The following user said thank you: KymriskaDraken
Summer 1991 timetable 26/11/2020 at 14:34 #134160
Edgemaster
Avatar
332 posts
Could the website moderators maybe indicate what the delay in approving the timetable is? 6 days does seem a bit longer than normal?
Twitter
Last edited: 26/11/2020 at 14:40 by Edgemaster
Reason: None given

Log in to reply
The following users said thank you: KymriskaDraken, Trainfan344
Summer 1991 timetable 26/11/2020 at 15:03 #134161
GeoffM
Avatar
6376 posts
Online
Edgemaster in post 134160 said:
Could the website moderators maybe indicate what the delay in approving the timetable is? 6 days does seem a bit longer than normal?
Holiday week here, and I've been sick. There is a sim release backlog too.

SimSig Boss
Log in to reply
The following user said thank you: njimiller
Summer 1991 timetable 26/11/2020 at 16:39 #134162
WesternChampion
Avatar
173 posts
GeoffM in post 134161 said:
Holiday week here, and I've been sick. There is a sim release backlog too.
Happy Thanksgiving! Get well soon! Ooh, interesting!

Log in to reply
Summer 1991 timetable 26/11/2020 at 23:56 #134167
58050
Avatar
2659 posts
For those interested the new West Hampsstead summer 1991 TT has now been approved & available for download in the usual place.
Log in to reply
The following users said thank you: jc92, 47417, Trainfan344, sunocske, bossman, phil1044
Summer 1991 timetable 27/11/2020 at 00:12 #134168
headshot119
Avatar
4869 posts
Yes I've cleared through the files that where pending.

It does take time to check through all the submissions, and make sure nothing nasty or erroneous is getting through, unfortunately I've been working long days this week so I've not found time to look through everything before tonight.

If anyone happens to upload anything over the next few days it'll probably be looked at quicker as I'm off work

"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Log in to reply
The following users said thank you: tjtbcork, 47417
Summer 1991 timetable 27/11/2020 at 06:15 #134171
sunocske
Avatar
121 posts
Thanks to all, I'll give it a go tonight (hey, it's friday, no danger of oversleeping tomorrow)
Log in to reply
Summer 1991 timetable 27/11/2020 at 16:46 #134181
Splodge
Avatar
716 posts
Is the 2Z99 OHLE train always booked to run? Only I started a TT which rolled on a Tuesday, but no 2Z99 spawned
There's the right way, the wrong way and the railway.
Log in to reply
Summer 1991 timetable 27/11/2020 at 17:51 #134184
jc92
Avatar
3685 posts
Splodge in post 134181 said:
Is the 2Z99 OHLE train always booked to run? Only I started a TT which rolled on a Tuesday, but no 2Z99 spawned
no, there's a good chance it will, but it isn't guaranteed.

"We don't stop camborne wednesdays"
Log in to reply
The following user said thank you: Splodge
Summer 1991 timetable 27/11/2020 at 19:01 #134185
58050
Avatar
2659 posts
Splodge in post 134181 said:
Is the 2Z99 OHLE train always booked to run? Only I started a TT which rolled on a Tuesday, but no 2Z99 spawned
OK, but did 2Z56 spawn at King's X/St. Pancras?

Log in to reply
Summer 1991 timetable 27/11/2020 at 19:31 #134186
Splodge
Avatar
716 posts
No - that was partly why I asked with 2Z56 being specifically a 25% chance of entering.
There's the right way, the wrong way and the railway.
Log in to reply
Summer 1991 timetable 27/11/2020 at 22:49 #134190
sunocske
Avatar
121 posts
I had both on a monday session
Log in to reply
Summer 1991 timetable 28/11/2020 at 00:37 #134191
58050
Avatar
2659 posts
[quote=sunocske;post=134190]I had both on a monday session :)[/quote

I'd be interested to hear froim users who got the OLE trains how they fared with them as 2Z99 can appear in 1 out of 16 different places at the start of a new day.

Log in to reply
Summer 1991 timetable 28/11/2020 at 08:39 #134192
sunocske
Avatar
121 posts
I have had it at Leagrave on the Up Fast and monday timetable, so I sent every other trains on the slow lines between Harpenden Jn and Leagrave Jn. The traffic was low, so 2Z99 did not cause many problems.
Log in to reply
Summer 1991 timetable 28/11/2020 at 11:19 #134200
mfloyd
Avatar
189 posts
2Z99 on DS at Radlett and 2Z56 at St Pancras towards Moorgate. No issues with either. Thurs TT
Ripley, Derbyshire
Log in to reply
Summer 1991 timetable 28/11/2020 at 12:19 #134206
bossman
Avatar
93 posts
I have 2Z99 on DS at Radlett but 2Z56 hasn't spawned. The day is Monday.
cliff cook
Log in to reply
Summer 1991 timetable 28/11/2020 at 13:36 #134209
58050
Avatar
2659 posts
OK thanks for the feedback chaps. 2Z56 shouldn't cause any issues really as nothing is on that part of the sim during the time is moves about. 2Z99 on the other hand can caise issues if you don't switch everything from the Slow lines to Fast lines or Slow lines to Fast lines at the junctions between where 2Z99 spawns. Obviously nothing can run past 2Z99 as the power is isolated between the neutral sections within the possession limirs But it makes you think during the early hours when it's relATIVELY QUIET. One thing to note if you are running a Monday or Tuesday. There's a 6Z79 Scunthorpe to Dover town conveying 15 loaded Transfesa 2 axle vans loaded with steel. This train enters around 08.30 time Wellingborough & the timings are taken from the actual freight advice & has a crew change at Brent Curve Jn. Despite the timings being close to the end of the morning peak period those are the actual timings on the freight advice. But I hope you enjoy this TT more than the original.
Log in to reply
The following user said thank you: mfloyd
Summer 1991 timetable 28/11/2020 at 14:22 #134212
Table 52
Avatar
37 posts
I also ended up with 2Z99 DS at Radlett on. Tuesday TT, also got 2Z56 as well. The situation was made worse by one of the up overnight passenger services breaking down at St Albans for an hour, effectively knocking out the US all the way from Harpenden Jn to West Hampstead.
Log in to reply