Page 1 of 1
25 Dec 2021 TT 03/01/2022 at 15:00 #143268 | |
Dionysusnu
577 posts |
This newly uploaded timetable contains a grand total of 9 trains.. was the area under some sort of possession, or is the timetable broken?
Log in to reply |
25 Dec 2021 TT 03/01/2022 at 15:11 #143269 | |
Trainman525
83 posts |
The one day the railway is closed, and still 9 trains... no days off for signallers.
Log in to reply |
25 Dec 2021 TT 03/01/2022 at 15:19 #143271 | |
northroad
872 posts |
Dionysusnu in post 143268 said:This newly uploaded timetable contains a grand total of 9 trains.. was the area under some sort of possession, or is the timetable broken? No ARS required then Log in to reply |
25 Dec 2021 TT 03/01/2022 at 18:05 #143312 | |
rfw
177 posts |
The Timetable isn't broken, there's just a couple of Sandite or weedkiller trains out of Effingham Junction shuffling around, whilst every other TOC shuts down operations for the day. If you look in the notes of the last train to run, you can see I do admit it was a bit of a joke, I just couldn't resist & I was 3 green ginger wines deep, I blame my immaturity personally. Trainman525 in post 143269 said: The one day the railway is closed, and still 9 trains... no days off for signallers.Technically there were 4, but 2 of those reversed at WIM, which can't be simulated on this one and the other 2 are seen 'in bounds' 5 times collectively, If I'd had my way and could reverse without terminating at a signal outside of CLJ, there would only be 5! But alas I had to extend the real services and route them to QRB to terminate reverse. That being said, the last train (354Y-05) does complain of a wrong route when leaving QRB #2/UWF through Clapham yard, saying it is routed via Clapham main. But ARS knows what to do. Some type of bug? - maybe Geoff didn't anticipate someone programming in this daft a maneuver? The train now standing on platform 2, should be on the rails Last edited: 03/01/2022 at 18:06 by rfw Reason: formatting Log in to reply |
25 Dec 2021 TT 03/01/2022 at 18:29 #143314 | |
bill_gensheet
1413 posts |
You missed 1X01 ............. ;-)
Log in to reply |
25 Dec 2021 TT 03/01/2022 at 19:11 #143315 | |
GeoffM
6376 posts |
rfw in post 143312 said:maybe Geoff didn't anticipate someone programming in this daft a maneuver?Weedkillers, squirties, sandites etc generally are a pain in the posterior. SimSig Boss Log in to reply |
25 Dec 2021 TT 06/01/2022 at 22:36 #143390 | |
rfw
177 posts |
bill_gensheet in post 143314 said:You missed 1X01 ............. ;-)And how exactly would you program that in? Simsig wouldn't even accept the sequence of stations and you'd just loose a whole bunch of performance points for not keeping up as it is timetabled to be overspeed of line speed. Just not practical to timetable in. And how long would I make it anyway? It's not like there's a wiki for the length of that particular unit The train now standing on platform 2, should be on the rails Log in to reply |
25 Dec 2021 TT 06/01/2022 at 22:45 #143392 | |
9pN1SEAp
1180 posts |
rfw in post 143390 said:It's not like there's a wiki for the length of that particular unitYou'd have to infer the consist length from the motive unit Jamie S (JAMS) Log in to reply |
25 Dec 2021 TT 06/01/2022 at 23:18 #143393 | |
northroad
872 posts |
9pN1SEAp in post 143392 said:rfw in post 143390 said:The easy part is the length of the motive power as wiki shows the average length of a male reindeer as being between 71 and 84 inches x 6 is equal to approx 504 inches. The length of the sled is the main problem here as with a present for everyone in the world (without mine as I didn’t get one from the wife) could be infinite……ho ho hoIt's not like there's a wiki for the length of that particular unitYou'd have to infer the consist length from the motive unit :) Log in to reply |
25 Dec 2021 TT 07/01/2022 at 10:31 #143397 | |
TimTamToe
664 posts |
northroad in post 143393 said:9pN1SEAp in post 143392 said:would need to adjust slightly for female reindeers though as all male reindeers would have lost their antlers before December...rfw in post 143390 said:The easy part is the length of the motive power as wiki shows the average length of a male reindeer as being between 71 and 84 inches x 6 is equal to approx 504 inches. The length of the sled is the main problem here as with a present for everyone in the world (without mine as I didn’t get one from the wife) could be infinite……ho ho hoIt's not like there's a wiki for the length of that particular unitYou'd have to infer the consist length from the motive unit :) Log in to reply |
25 Dec 2021 TT 07/01/2022 at 11:27 #143398 | |
bill_gensheet
1413 posts |
rfw in post 143390 said:bill_gensheet in post 143314 said:This year it was pretty close to station ordering. As we don't have a WHL sim there is no problem dealing with the 'new' station between Rannoch and CorrourYou missed 1X01 ............. ;-)And how exactly would you program that in? Simsig wouldn't even accept the sequence of stations and you'd just loose a whole bunch of performance points for not keeping up as it is timetabled to be overspeed of line speed. https://www.realtimetrains.co.uk/search/detailed/gb-nr:ZNGHTYK/2021-12-25/0001 fair enough on the timings, although he got +8 at some places. Log in to reply |
25 Dec 2021 TT 07/01/2022 at 23:15 #143406 | |
rfw
177 posts |
I was curious when I saw it, if 1X01 was an Easter egg from RTT or from NR
The train now standing on platform 2, should be on the rails Log in to reply |