Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Who's Online

andi, jem771, Soton_Speed, TUT, Person82, 442s3, rodney30 (7 users seen recently)

Brighton, P2

You are here: Home > Forum > General > Timetabling > Brighton, P2

Page 1 of 1

Brighton, P2 26/04/2022 at 21:24 #146282
DaveHarries
Avatar
1285 posts
Hi,

I am trying to compile a timetable which is partly built around engineering works in the Brighton area. Those works rule out use of Platforms 4 to 8 leaving only 1, 2 and 3 in use. The TT is being built around the WTT for Sunday 08th May 2022. On that day train 5A89 from Lovers Walk T&RSMD is scheduled to enter from Lovers Walk on the WCR (West Carriage Road) and then forms 1A89 (0534 Brighton - London Victoria).

5A89 can only occupy the space between Signal T661 and the end of the line at Brighton station. Two queries therefore:

1. What would be the maximum train length permitted for that section of platform for trains coming into P2 from the Lovers Walk (West Carriage Road)?

2. Please could I suggest that the answer to 1, above, be added to the Wiki for TBASC as has been done with Platform 3 for trains from the Hove direction?

Cheers,
Dave

Log in to reply
Brighton, P2 26/04/2022 at 23:22 #146283
GeoffM
Avatar
6376 posts
Done, 200m.
SimSig Boss
Log in to reply
The following user said thank you: DaveHarries