Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Depot/Wheel Lathe Electrification

You are here: Home > Forum > Simulations > Released > Manchester Piccadilly > Depot/Wheel Lathe Electrification

Page 1 of 1

Depot/Wheel Lathe Electrification 06/11/2022 at 21:27 #148661
HST125Scorton
Avatar
1192 posts
Era 2018-2020

For Manchester International Depot Wheel Lathe 2 & 3 roads are they electrified?. Reason I ask this from my own viewings and Google Maps it seems to have OHLE into the roads up to the sheds. I have a timetable under work and it states 'Wrong Traction Power' for Longsight Wheel Lathe 2 & 3. Only other solution is to use the Excursion Platform which also doesn't mention how long it actual is within the manual.

Aaron (AJRO) | Timetable Writer
Last edited: 06/11/2022 at 21:27 by HST125Scorton
Reason: None given

Log in to reply
Depot/Wheel Lathe Electrification 06/11/2022 at 21:33 #148663
Splodge
Avatar
720 posts
They are all electrified although the wheel lathe building itself isn’t - but you can get a 397 in between the signal and the building. The two depot roads are fully electrified although the wires were isolated until a month or so ago in readiness for Northern to take over the depot as New Bank St LMD

I don’t have a length for the excursion platform but you can get 4 323s in there with plenty of room to spare.

There's the right way, the wrong way and the railway.
Log in to reply
The following user said thank you: HST125Scorton
Depot/Wheel Lathe Electrification 06/11/2022 at 21:38 #148664
HST125Scorton
Avatar
1192 posts
Thank you for this. I did hear about Northern using the Depot but never caught the name of it.
Instead Mchester Internation Dep according to RTT.
RTT Example: http://www.realtimetrains.co.uk/service/gb-nr:C54349/2023-02-02/detailed

So in theory 2x 3-Car Class 331s[6-Car Total] should fit on the Excursion Platform without issue.

Curious to know if its actually electrified on the actual sim?

Aaron (AJRO) | Timetable Writer
Log in to reply
Depot/Wheel Lathe Electrification 06/11/2022 at 21:40 #148665
headshot119
Avatar
4869 posts
Electrical section HM-8Y which covers Wheel Lathe Road 3 has been permanentely earthed for many years (And in fact may never have been energised.) until very recently (October 2022). Section HM-8F which covers Road 2 is a strange one, it is energised if required, but spends a lot of time under a BTET. This was the situation when the simulation was written, and remained until very recently.

From December Northern will be using the International depot for 4 movements on and off per day, the simulation doesn't currently reflect this.

Excursion will take 12 x 23m vehicle.

"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Last edited: 06/11/2022 at 23:20 by headshot119
Reason: None given

Log in to reply
The following user said thank you: HST125Scorton