West Hampstead May to September 1991 Updated Timetable 11/11/2022 at 17:18 #148697
58050
Avatar
2659 posts
This timetable has been updated since the original was released. This now includes a number of changes compared to the original which I'll list below:-
1. Both OHLE(Over Head Line Equiptement] trains may now 'SEED' in various locations[2Z99 only] 2Z56 which is formed of a former 2 car Cl.501 DC EMU, coverted to battery power to work on the OHLE between Kentish Town & Moorgate. This may appear from time to time working between Kings Cross Thameslink & Moorgate & back. The other train 2Z99 formed of Cl.31/1/Cl.31/4+OHLE train. This one could 'SEED' at a myriad of locations between St. Pancras & Bedford & take possession of either the FL or SL for a certain number of hours between midnight & around 04.30, before returing to Bedford. Users will need to re-route trains off & on there booked lines to avoid the possession.
2. To increase the number of trains dealt with by panel 2 I decided to increase the traffic between Upper Holloway Jn & Dudding Hill Jn. to simulate the North London Line having engineering work overnight, therefore some 50+ freight services have been added to the timetable that would normally run over the NLL are now diverted between Dudding Hill Jn & Upper Holloway Jn in either direction.
3. With other info I've been given or collected I've also managed to include the loco diagrams to the mail/parcel services. Also some additional freight train services that ran via the MML have also been added. The total number of trains in this timetable is now 1,083.
I hope you prefer this version of the timetable over the original & if anyone finds any issues could you please raise it on this thread for me to look at. I'd also like to thank those users who were involved with the testing of this version of the timetable namely William(waucott), John(lifeboatjohn), Andy(AndyG), Albert & Rocangus. If I've missed anyone apologies for that. This version of the timetable has been uploaded & awaiting moderators approval. Thanks.

Log in to reply
The following users said thank you: bossman, jc92, sunocske, flabberdacks, Phil-jmw
West Hampstead May to September 1991 Updated Timetable 11/11/2022 at 18:05 #148698
flabberdacks
Avatar
636 posts
Terrific, this is one of my favourite timetables and I'm keen to give the new version a run
Log in to reply
The following user said thank you: 58050
West Hampstead May to September 1991 Updated Timetable 11/11/2022 at 19:05 #148699
58050
Avatar
2659 posts
To expand slightly on item 2 in my post above the diverted freight trains all comee from or go to the Anglia, Eastern, Southern & Western Regions. There are no diverted freight trains going on or coming off the WCML as there's no direct route from Willesden to Dudding Hill Jn without involving a RR at Acton Canal Wharf Jn. which is lmited due to its length limit. But the other 4 regions don't need RRs at Acton Canal Wharf so can run direct.
Log in to reply
The following user said thank you: sunocske
West Hampstead May to September 1991 Updated Timetable 12/11/2022 at 15:58 #148709
58050
Avatar
2659 posts
The new timetable file has now been approved by moderators & is now available in the downlads area.
Log in to reply
The following user said thank you: sunocske
West Hampstead May to September 1991 Updated Timetable 26/11/2022 at 23:01 #148993
58050
Avatar
2659 posts
For whatever reason which I can't answer at the moment it would appear that this version of the updated West Hampstead summer 1991 TT only has 1,077 trains in it, where it should contain 1,083 trains. 6 trains appear to be missing. That said I've now upload v3.0 of this TT which does contain 1,083 trains. So to all those users who downloaded v2.0 of the updated summer 1991 TT could you please download v3.0 of this TT which has been approved by moderators & is now available in the 'Downloads' area of the website. Sorry for the hiccup regarding this TT.
Log in to reply
West Hampstead May to September 1991 Updated Timetable 01/12/2022 at 17:01 #149081
Splodge
Avatar
717 posts
Very minor issue, but 0F45 enters before the train it's supposed to join to (7F45 - 1305 at Bedford Yard)
There's the right way, the wrong way and the railway.
Log in to reply
The following user said thank you: 58050
West Hampstead May to September 1991 Updated Timetable 01/12/2022 at 21:07 #149085
58050
Avatar
2659 posts
I'll take a look at that over the weekend & report back to you on what I've done to fix this.
Log in to reply
The following user said thank you: Splodge
West Hampstead May to September 1991 Updated Timetable 04/12/2022 at 21:55 #149150
58050
Avatar
2659 posts
Splodge in post 149081 said:
Very minor issue, but 0F45 enters before the train it's supposed to join to (7F45 - 1305 at Bedford Yard)
OK I've looked at the TT data for the all the trains involved & they should run in order. Maybe the only thing missing is the addition of a rule which should read Train $0F451310 Must appear 1 minute after $7f451305 arrives at Bedford SJ Goods Loop, as there doesn't seem to be a rule in the TT for this. In order of events what should happen is BFDP/$BGDP1255 should enter off the loco holding sdgs at 12.55 then reverse behind GPS611 & go into Bedford Yard. Then 7F45/$7F451305 should enter from Bedford Yard & run onto Bedford SJ Goods Loop whereby BFDP should detach off the front & then 0F45/$0F451310 should then attach itself onto the front of 7F45 which reverses on Bedford SJ Goods Loop before departing northwards towards Wellingborough en route to Loughborough ARC for loading. BFDP then returns onto Bedford holding sdgs. The entry times show in the correct order so unless you ended up sending BFDP which enters at 12.55 the wrong way the entry times for the trains seem to be in the correct order. Obviously panel 4 is probably the most difficult on the sim & if trains are running late this could affect the running of these trains. But the train loco for 7F45 is shown to enter at 13.10 5 minutes after 7F45 enters at 13.05.

Log in to reply
West Hampstead May to September 1991 Updated Timetable 12/12/2022 at 16:00 #149252
flabberdacks
Avatar
636 posts
Did you do anything to affect the early morning 3C02mx? No loco entered to attach to it at St Pancras by 0620, ended up removing the train (day of the week is Tuesday)
Log in to reply