Doncaster PSB (South) Winter 1999

You are here: Home > Forum > Simulations > Released > Doncaster (South) > Doncaster PSB (South) Winter 1999

Page 1 of 1

Doncaster PSB (South) Winter 1999 31/01/2023 at 18:20 #150352
0D07
Avatar
91 posts
Hi,

I have submitted for moderator approval my Doncaster South Winter 1999 Timetable. Unlike my previous offering Doncaster North (That has been updated). The southern section of the area controlled by Doncaster PSB is much quieter than the the rest of the area that the box controls. However, That said there is still regulating to be done 125mph Passenger trains mingling with 75mph local passengers and also slower freight traffic, this timetable will at times be a challenge for some!

The timetable has the GNER HST's and 91+MK4 Sets along with North of London Eurostar sets. Central Trains passenger services dominate the local passenger traffic note that the Skegness Branch has unbalanced workings via Barkston South this was how it was shown in the WTT. This was a bottle neck and paths on the ECML was at a premium on this section. Freight is also catered for with cross country Oil Traffic from the Humberside Oil Refineries, Yorkshire & North East to Felixstowe Freightliner Traffic along with EWS Enterprise and Intermodal Trains. Also not for getting RES Royal Mail Traffic from The Princess Royal Distribution Center at Willesden to Scotland, Low Fell and Doncaster Royal Mail Terminals with it being in winter the Christmas Additional Trains have been shown.

There is a couple of known issues 1 is that the signalman is unable to set a route from D34-D36 Signals at Barkston South and a Mantis Ticket has been raised.
2 When passenger trains from Nottingham Reverse at D88 to come back into Newark Northgate Paltform 3 they proceed to D74 at the end of Newark Northgate to overcome this simply abandon the timetable and reverse the unit and then place it back onto its orignal timetable and this cures the issue.

Every effort has been made to make this timetable as accurate as possible and the relevant Working Timetables and Special Traffic Notices and Freight Weekly plans that I have in my collection have been used to produce the timetable.

Thanks,
Zero Delta Zero Seven

Log in to reply
The following users said thank you: bossman, flabberdacks, norman B
Doncaster PSB (South) Winter 1999 05/02/2023 at 12:51 #150391
0D07
Avatar
91 posts
The timetable is now available to download, please drop any comments that you may have or clashes that I have missed during testing.

Thanks,

Zero Delta Zero Seven

Log in to reply
Doncaster PSB (South) Winter 1999 05/02/2023 at 14:27 #150392
bugsy
Avatar
1795 posts
0D07 in post 150352 said:
Hi,

I have submitted for moderator approval my Doncaster South Winter 1999 Timetable. ......

Thanks,
Zero Delta Zero Seven
That's interesting. First, a Doncaster North Winter 1999 timtable and now a Doncaster South one.

I'm really looking forward to the release of the Doncaster Station sim, after which I shall be keepinhg a close eye out for (hopefully) your Doncaster Station Winter 1999 timetable.

Incidentally. I'm on my second session of your Doncaster North tt which I find really goo with TORR off.

Everything that you make will be useful - providing it's made of chocolate.
Log in to reply
Doncaster PSB (South) Winter 1999 05/02/2023 at 14:56 #150393
bugsy
Avatar
1795 posts
0D07 in post 150352 said:
Hi,

I have submitted for moderator approval my Doncaster South Winter 1999 Timetable. ......

Thanks,
Zero Delta Zero Seven
That's interesting. First, a Doncaster North Winter 1999 timtable and now a Doncaster South one.

I'm really looking forward to the release of the Doncaster Station sim, after which I shall be keepinhg a close eye out for (hopefully) your Doncaster Station Winter 1999 timetable.

Incidentally. I'm on my second session of your Doncaster North tt which I find really much better with TORR off

Everything that you make will be useful - providing it's made of chocolate.
Log in to reply