Page 1 of 1
CE149 / CE151 aspects 07/07/2023 at 07:39 #152299 | |
BenWright
195 posts |
CE 151 will not show any proceed aspect until the train has crawled up to it even when the next signal is showing a green aspect, although this only occurs when the route is set onto the DF. Is this prototypical? It doesn't mention anything in the manual, only that CE149 will most of the time copy CE151. Post has attachments. Log in to view them. Log in to reply |
CE149 / CE151 aspects 07/07/2023 at 08:18 #152300 | |
bill_gensheet
1413 posts |
It is 20mph pointwork on a 60mph 'straight' route. Would therefore expect a form of approach control Bill Log in to reply |
CE149 / CE151 aspects 07/07/2023 at 08:43 #152301 | |
BenWright
195 posts |
Ah right, just remembered it's 80 instead of 60 which probably would need approach control like you said. Thanks
Log in to reply |