Page 1 of 1
Signal GL9032 02/01/2024 at 17:40 #154950 | |
marychristmaseverybody
45 posts |
Hello. I'm having trouble setting a route from signal GL9032 to the Through Siding, as the points coming out of the Dn Salop Goods Loop appear to be locked normal. Is there a hidden overlap which I have to wait for?
Post has attachments. Log in to view them. Log in to reply |
Signal GL9032 02/01/2024 at 18:15 #154951 | |
9pN1SEAp
1180 posts |
The train is stuck at (non-visible) signal GL37 out of Crewe TMD. Once authorised to pass, it will come to a halt at GL9032, and after a short time the flank locking will time out allowing onward route to GL9014. As it moves forward a "non-described train in berth GLDL" message appears with **** shown in that berth. Jamie S (JAMS) Log in to reply |
Signal GL9032 02/01/2024 at 18:36 #154952 | |
Hap
1037 posts |
marychristmaseverybody in post 154950 said:Hello. I'm having trouble setting a route from signal GL9032 to the Through Siding, as the points coming out of the Dn Salop Goods Loop appear to be locked normal. Is there a hidden overlap which I have to wait for?Already reported on the Crewe FAQ Mantis 39252, resolved for next release of Crewe. Thanks Craig How to report an issue: www.SimSig.co.uk/Wiki/Show?page=usertrack:reportanissue Log in to reply The following user said thank you: marychristmaseverybody |