Page 1 of 1
Train delays in SIMBIDS working 18/03/2024 at 20:30 #155763 | |
9pN1SEAp
1180 posts |
Hi, Not sure if this sim-specific (and apologies if it's been asked before). 9B43 has just called for delay at Southend East whilst working Up on the Down Main, but didn't ask if I would be replacing the signal (not that I can drop it below YY). I think it's read the down starter UR339. Thanks Jamie Post has attachments. Log in to view them. Jamie S (JAMS) Last edited: 18/03/2024 at 20:34 by 9pN1SEAp Reason: None given Log in to reply |
Train delays in SIMBIDS working 18/03/2024 at 21:02 #155764 | |
MarkC
1105 posts |
I believe this case is correct, as the next main signal the train would look for to put back is Signal 586, as the train is at a repeater (Signal 586RR) showing it most restrictive aspect the driver would already know signal 586 is at red therefore no need to ask for replacement, if signal 586 was showing a proceed aspect the the train would of called and asked for a replacement.
Log in to reply The following user said thank you: Hap |
Train delays in SIMBIDS working 24/03/2024 at 17:53 #155820 | |
9pN1SEAp
1180 posts |
Thanks Mark!
Jamie S (JAMS) Log in to reply |