Page 2 of 2
Doncaster 1981 Summer Weekdays 16/08/2024 at 15:23 #158210 | |
postal
5223 posts |
zak bevington in post 158209 said:Yes I used the up decoy shunter panel to change points and signals out of sidings and the train was still stood in the siding. It’s no big deal however I’ll just use US4 as that works for me. May I add too it’s a really good timetable, I can tell a lot of time and effort has gone into this and maybe the best timetable I’ve ever playedIf you could let people see a saved game where the train has the problem then someone may be able to find out what is causing the problem. Even though you are managing with a workaround it would be good to identify the problem in case anyone else runs into the same trouble. “In life, there is always someone out there, who won’t like you, for whatever reason, don’t let the insecurities in their lives affect yours.” – Rashida Rowe Log in to reply |
Doncaster 1981 Summer Weekdays 22/08/2024 at 04:40 #158257 | |
swiftaw
270 posts |
I think there is an issue with 9T27 / 239T276T104. Its destination is listed as Down Decoy Reception Sdgs Platform 5, but that doesn't exist. Its either Down Decoy Reception Sdgs Platform 1-4 or its Down Decoy Nos 5 to 7 Platform 5. Log in to reply |