Is this a normal timetable schedule?

You are here: Home > Forum > General > Timetabling > Is this a normal timetable schedule?

Page 1 of 1

Is this a normal timetable schedule? Today at 11:52 #159907
M'vy
Avatar
6 posts
I'm running an Exeter 2009-10-15 SX simulation, and I'm seeing this timetable for 2S95 (figure 1)

I've realised that the train runs very early and now see that there is an a gap of 26.5 minutes from Norton Fitzwarren and Whitehall tunnel. There is no way this path takes that long.

For example the following train has NF - WT to be 24.5 minutes, but that seems to include 18 in engineering allowance?

Is the engineering allowance not always reported in the TT?




Post has attachments. Log in to view them.
Log in to reply
Is this a normal timetable schedule? Today at 12:12 #159908
bill_gensheet
Avatar
1442 posts
It probably should be there for both. The allowance is in the original WTT for both trains - see attached page.

However depending on the source and import method used for this SimSig timetable the allowances may have needed manual addition, and that might not have shown up on test as 2S95 is a set down only timing at Tiv Parkway.

Over to the TT author for further comments.

Post has attachments. Log in to view them.