Approach control on EY653 at Dalmeny 24/03/2010 at 17:33 #974
Andrew G
Avatar
552 posts
Online
I'm not sure if this is correct and possibly due to a lower line speed, but I would have expected that routes from EY653 to the Down and Up Passenger Loops at Dalmeny would be approach controlled. As things stand EY653 clears to Off immediately for all 3 possible routes.
Log in to reply
Approach control on EY653 at Dalmeny 24/03/2010 at 17:33 #7748
Andrew G
Avatar
552 posts
Online
I'm not sure if this is correct and possibly due to a lower line speed, but I would have expected that routes from EY653 to the Down and Up Passenger Loops at Dalmeny would be approach controlled. As things stand EY653 clears to Off immediately for all 3 possible routes.
Log in to reply
Approach control on EY653 at Dalmeny 24/03/2010 at 20:04 #7752
Firefly
Avatar
521 posts
It depends on the line speed off of the Winchburgh line. I don't have any easy access to the sectional appendix any more but if you can email me a copy or if you happen to know the line speeds I'll have a look at it.
Log in to reply
Approach control on EY653 at Dalmeny 24/03/2010 at 20:40 #7754
postal
Avatar
5265 posts
Line speed is 50mph, reducing to 40mph approaching then 30mph over junction according to Sectional Appendix I downloaded from http://www.networkrail.co.uk/browseDirectory.aspx?dir=Baseline%20CapabilityTrack%20and%20route%20mileage,%20Permissible%20line%20speeds&pageid=5523&root= (SC113-001 on P200 of the document).

Beware - it is a 190Mb download for the Scottish document

“In life, there is always someone out there, who won’t like you, for whatever reason, don’t let the insecurities in their lives affect yours.” – Rashida Rowe
Log in to reply
Approach control on EY653 at Dalmeny 24/03/2010 at 20:53 #7755
Firefly
Avatar
521 posts
Thanks.

Just downloading all 190mb!! I hadn't realised you could get copies of an albeit outdated section appendix online.

Log in to reply
Approach control on EY653 at Dalmeny 24/03/2010 at 20:53 #7756
Andrew G
Avatar
552 posts
Online
I am afraid that I don't have access to that information either. I think I have a Sectional Appendix from a few years ago, but as usual when you want these things I can't find it. I suppose my question is why is approach control on EY651 for the routes to the passenger loops but not on EY653. Has it been left off intentionally?
Log in to reply
Approach control on EY653 at Dalmeny 24/03/2010 at 21:12 #7757
Firefly
Avatar
521 posts
ok downloaded it now.

EY651 has approach control to the loops because the linespeed on approach to the junction is 60mph (80 for HST's) and the speed into the Down Passenger Loop is 40mph. (the xover for the UPL is 30mph).

The linespeed off of the Winchburgh line is 30mph. Because all trains must be doing 30mph there is no need to apply approach control to EY653 signal because drivers will be expecting to do 30mph at the junction, will have seen the route indication given on EY653 and accelerate accordingly.

Hope that helps

Kev

Log in to reply
Approach control on EY653 at Dalmeny 24/03/2010 at 22:07 #7759
Andrew G
Avatar
552 posts
Online
Thanks for looking into this and confirming that the lower line speed has removed the need for approach control.
Log in to reply