(UTC times)
A long awaited simulation of the Welsh valley lines. Covering the former Heath Junction, Ystrad Mynach South, and Bargoed signalboxes, as well as the current Radyr and Abercynon signalboxes.
The simulation contains five workstations, and features a wide array of working, from the old staff and ticket, to modern track circuit block. NSKT/NSTR systems are reproduced with phone calls for authority to withdraw tokens.
It also ships with a selection of timetables. Two standard weekday timetables, one from 2015 the other from 2016. Two weekend diversion timetables, both of which provide different scenarios.