You are here: Home > Files > User-contributed > Timetables > Exeter > File Details - Exeter November SX 2021

File Details - Exeter November SX 2021

Title
Exeter November SX 2021
Description

Exeter SX 2021
Based on 12th November 2021.

South Western Railway:
Due to the line blockage at Salisbury, SWR ran shuttles between Exeter and Salisbury and Salisbury and rail replacement buses between Salisbury and Waterloo.

Great Western Railway:
GWR ran a normal service between London and Plymouth, with IET - class 800s and 802s. Also included in this timetable is the GWR test trains (5Z55/56/61) down the Dartmoor Line to Okehampton in preparation of the line reopening.

Total Trains: 419
Start Time: 0000
End Time: 2700

Category
User-contributed > Timetables > Exeter
Published
Status
Approved
Submitted
18/12/2021 at 14:20
Submitted By
haydenrobertson
Number of Downloads
447
Version
1.0.0
File Size
60.4 KiB
File Name
Exeter November SX 2021.WTT

Download | Edit | Back to List