Page 1 of 1
Oxford 22/08/2017 at 16:40 #101192 | |
keredsonej
16 posts |
I have recently obtained the Oxford simulation and I am having a few problems for which I would be grateful of some assistance. I am using the 15th October 2009 (04.45 start) timetable and the problem is with Hinksey. Train 6V25 has arrived in No 2 Reception line. It is supposed to join(?) with 0S00 which was held in the yard sidings. I have not been able to get anything to happen despite trying various ways and I am now wondering if I am doing something wrong or not doing something that is required. Does South GF come into play with this move at all. Are there any written instructions available anywhere? Please help. Many thanks. Log in to reply |
Oxford 22/08/2017 at 19:12 #101194 | |
Steamer
3985 posts |
0S00 should enter from #2 Down Siding. It can then be routed into the #2 Reception line. Depending on how far down 6V25 is, you may need to authorise it to pass the stop board; it will phone in for permission to do this and display as 'Waiting at red signal' in the F2 list. There's a short (think it's 2 minutes) delay when setting another route into the Reception lines just after a previous move; this may be in effect. If that doesn't help, please could you provide details of where each train is and what it's shown as doing in the F2 train list? "Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q) Log in to reply |
Oxford 23/08/2017 at 03:22 #101197 | |
BarryM
2158 posts |
All works fine for me. Have attached an F2. Perhaps they are on different lines in your F2?
Post has attachments. Log in to view them. Barry, Sydney, New South Wales, Australia Last edited: 23/08/2017 at 03:26 by BarryM Reason: None given Log in to reply |