Page 1 of 1
Clearing point violation 29/08/2010 at 09:01 #1683 | |
Jsun
212 posts |
Strange, while testing an add on timetable for Cscot I signalled a light engine from the south sidings through Stirling P6 as the train passed SM47 I replaced the signal and normaled up the points in advance of that signal (the facing points to P6 not P10) and was immediately hit with a clearing point violation even though SM33 was cancelled (not that it matters it's a shunt). This seems wrong I'm sure I'm allowed to move points once the train has gone.
Log in to reply |
Clearing point violation 29/08/2010 at 09:01 #11105 | |
Jsun
212 posts |
Strange, while testing an add on timetable for Cscot I signalled a light engine from the south sidings through Stirling P6 as the train passed SM47 I replaced the signal and normaled up the points in advance of that signal (the facing points to P6 not P10) and was immediately hit with a clearing point violation even though SM33 was cancelled (not that it matters it's a shunt). This seems wrong I'm sure I'm allowed to move points once the train has gone.
Log in to reply |
Clearing point violation 29/08/2010 at 10:18 #11108 | |
Peter Bennet
5402 posts |
I have done quite a lot of revisions to the CP data since so hopefully it's fixed for next release. Peter I identify as half man half biscuit - crumbs! Log in to reply |