Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

All RAIB Reports

You are here: Home > Forum > Miscellaneous > The real thing (anything else rail-oriented) > All RAIB Reports

Page 17 of 17

All RAIB Reports 24/11/2018 at 14:59 #113499
AlexRail575
Avatar
136 posts
Interesting:

Quote:
190 The accident at Waterloo and the Cardiff East Junction incident resulted from
people taking actions which were inconsistent with the processes in which they
had been assessed as competent. Had these processes been followed, the
events would have been prevented. The RAIB found no evidence that the staff
and organisations involved at Waterloo and Cardiff lacked a commitment to
safety. In this respect, the RAIB’s findings at Waterloo and Cardiff have much in
common with this extract from the Hidden report [i.e. the Clapham Junction accident] chapter 17 ‘Where things went
wrong – The Lessons to be learned’: [...]

Log in to reply
All RAIB Reports 25/11/2018 at 01:31 #113531
RainbowNines
Avatar
272 posts
Agree it was an interesting comment - rarely does RAIB conjecture like this... how can you base this conclusion in fact?

But fair play to them - with the recent signalling events in their investigation list maybe they feel there’s a point to be made... another signalling case might trigger one of their class investigations.

Log in to reply
All RAIB Reports 25/11/2018 at 14:11 #113536
kbarber
Avatar
1742 posts
I don't think it's conjecture. There were distinct similarities, at least behaviourally, between both these cases and Clapham, and both resulted in the safety systems becoming ineffective. Yet all 3 were carried out by people and organisations who were absolutely committed to safety. RAIB's point is that the corporate memory is disappearing as the Clapham generation reaches retiring age, and something needs to be done about that. (They're not alone in that conclusion; Roger Ford effectively said the same in his analysis of RAIB's interim report.)
Log in to reply
The following user said thank you: BarryM
All RAIB Reports 02/05/2019 at 21:59 #118031
Albert
Avatar
1315 posts
---published yesterday---

RAIB has today released its report into a train dispatch accident at Elstree & Borehamwood station, 7 September 2018.

https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/798697/R032019_190501_Elstree___Borehamwood.pdf

AJP in games
Log in to reply
All RAIB Reports 15/12/2020 at 09:46 #134755
MarkC
Avatar
1105 posts
RAIB have released their report into the Near miss between a passenger train and cars at Norwich Road level crossing, New Rackheath, Norfolk, 24 November 2019

https://assets.publishing.service.gov.uk/media/5fd380178fa8f54d60878a88/R152020_201214_Norwich_Road.pdf

Log in to reply
All RAIB Reports 04/03/2021 at 18:57 #137612
Dionysusnu
Avatar
577 posts
Bit late, but RAIB released a report into a person struck by a train after falling off the platform edge at Eden Park station.
https://assets.publishing.service.gov.uk/media/602e9915e90e076601e9f4a4/R012021_210219_Eden_Park.pdf

Log in to reply
All RAIB Reports 20/03/2021 at 17:05 #138003
Dionysusnu
Avatar
577 posts
Safety Digest about runaway during unloading from a road trailer, 10 December 2020 at Dereham.

https://www.gov.uk/government/publications/safety-digest-012021-dereham/runaway-and-near-miss-at-dereham-station-mid-norfolk-railway-10-december-2020

Log in to reply
All RAIB Reports 04/07/2021 at 13:21 #140326
rfw
Avatar
177 posts
Also a bit late on both of these -

RAIB Incident Report - Freight train derailment at Eastleigh
https://assets.publishing.service.gov.uk/media/603f71e4e90e077dcdd75295/R022021_210304_Eastleigh.pdf

RAIB Incident Report - Track worker struck by train near Roade
https://assets.publishing.service.gov.uk/media/60c082b7d3bf7f4bd2f546d0/R032021_210609_Roade.pdf

The train now standing on platform 2, should be on the rails
Last edited: 04/07/2021 at 13:21 by rfw
Reason: urls

Log in to reply
All RAIB Reports 10/03/2022 at 00:21 #145665
UKTrainMan
Avatar
1803 posts
RAIB synopsis and report published into the derailment of a ScotRail HST at Carmont, Aberdeenshire, on 12th August 2020:
https://www.gov.uk/government/news/report-022022-derailment-of-a-passenger-train-at-carmont

Synopsis (also included at the start of the actual report):

https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1059410/R022022_220310_Carmont_Synopsis.pdf
(4.06 MB .PDF - 36 pages)

Report (starts on page 35, after the included synopsis):

https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1059412/R022022_220310_Carmont.pdf
(14.5 MB .PDF - 298 pages)

Report (high resolution) (starts on page 35, after the included synopsis):

https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1059567/R022022_220310_Carmont_High_resolution.pdf
(42.1 MB .PDF - 298 pages)

Overview video: https://www.youtube.com/watch?v=6iP0PJMu_8s
(4 minutes 21 seconds)

Washout visualisation: https://www.youtube.com/watch?v=d926NZL2xOE
(2 minutes 55 seconds)

Any views and / or opinions expressed by myself are from me personally and do not represent those of any company I either work for or am a consultant for.
Last edited: 10/03/2022 at 16:21 by UKTrainMan
Reason: updated Washout Visualisation link (replacement video)

Log in to reply
All RAIB Reports 11/05/2022 at 15:21 #146450
DaveHarries
Avatar
1285 posts
Online
Update from the RAIB on the overspeed at Peterborough of Sunuday 17th April. Triple the speed limit though...
https://www.gov.uk/government/news/overspeeding-incident-at-peterborough-station

Dave

Log in to reply
The following user said thank you: Jsun
All RAIB Reports 29/09/2022 at 10:10 #148192
bill_gensheet
Avatar
1413 posts
RAIB report for Dalwhinnie now published.
Excerpts selected by posts on Scot-Rail group
Bill

--------------------------------

https://www.gov.uk/government/news/report-102022-wrong-side-signalling-failure-and-derailment-at-dalwhinnie-badenoch-and-strathspey

"The train was wrongly diverted because, even though the signaller had recently called the double-ended set of points to be in a position for the route along the main line, the points at the facing end of the crossover had remained set towards the crossover, while the points at the trailing end had moved to the correct position.
The signaller was able to clear the protecting signal, which allowed the train to approach the crossover in this condition, because of a wiring error in the signalling system that was introduced when the point machine at the trailing end was replaced some nine months earlier.
The front of the train was directed over the crossover and then trailed through and forced apart the points at the trailing end. The signalling system only then detected that the points were not correctly set and automatically re-sent a command for both point ends to move to the position that the signaller had earlier commanded. This caused the points at the facing end to move under the train, which derailed the rear of train as it passed over them."


"194 On 14 April 2021, Network Rail issued a special inspection notice with the
purpose of establishing if similar point machine configurations in the Scotland
region were affected (ScoR/SIN/001). Forty-nine sites were identified where
multi-ended points shared a common detection circuit. All had HW type point
machines installed. No issues of concern were found at any of these locations
and the inspection confirmed that 13 points at Dalwhinnie had been the only
multi-ended points on the Scotland region where GRS 5E type point machines
were installed.

195 Network Rail issued another special inspection notice on 19 April 2021 with the
purpose of establishing if similar point machine configurations were affected on
the wider network (NR/SIN/201). Inspection work identified internal detection
wiring discrepancies at two locations; both involved HW type point machines:
• Orpington, on Network Rail’s Kent route: the wiring was made correct to the
wiring diagram.
• Shildon, on Network Rail’s North & East route: the points were clamped out of
use with switch rails in the normal position."

Log in to reply