Huntingdon 12/02/2019 at 11:08 #115647
ajax103
Avatar
1120 posts
Just wondering but was there ever any point work from the Down Lines to Platform 1 here at any point in it's life?

I am aware that there was some point work to allow access on and off the St Ives branch there but I think that was lifted in the 70s when the station got remodelled for the wires?

Last edited: 12/02/2019 at 11:09 by ajax103
Reason: None given

Log in to reply
Huntingdon 12/02/2019 at 15:51 #115661
Soton_Speed
Avatar
285 posts
According to this OS Map (1971) there was no bay Platform 1 before the re-modelling (you may need to zoom out to get the map to show). The 1926 version shows a trailing cross-over ladder south of the station. The 1983 version appears to show the layout as depicted in Simsig.
In Zone 6, no one can hear you scream...
Log in to reply
Huntingdon 12/02/2019 at 21:35 #115677
M1ch4el
Avatar
21 posts
I don't believe so. Station staff say that back in the day when there was a guard + driver, they used to shunt out of 3 onto the down fast, then shunt into 2 and then up to the shunt signal south of Huntington, and back-up into 1. Driver in the front and guard in the back made it a quick move. It can still be done but it requires the driver to change ends, and on 2/365's makes it difficult if all lines are in use!

plt 3 -> shunt 40 -> plt 2 -> shunt 33 -> plt 1