Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Forthcoming Timetables

You are here: Home > Forum > General > Timetabling > Forthcoming Timetables

Page 21 of 32

Forthcoming Timetables 20/11/2020 at 16:45 #133994
DaveHarries
Avatar
1287 posts
Quick update on my Three Bridges timetable.

I was worrying earlier in the week that I might not get around to finishing what has been my biggest TT project since I started trying to write them. However the lack of work today (Friday 20th November) has given me the chance to get more done so all I have left to write in are the trains from Sutton to Streatham Hill and the Thameslink services between Brighton and London Bridge.

At the time of writing this timetable - which is a Sunday one (22nd November) based around engineering works taking place both on and off sim - I have 1107 trains in the TT: my previous biggest TT project - an Exeter sim one - had about 425 trains! Once complete the release and testing will not be too immediate as I will have to iron out any errors, do a bit more work on making sure as many trains as possible have the correct traction allocated (most of the trains written in so far do have that, thanks to a member of the SimSig community). Once all that is done then testing and, if all goes well, release of the TT will follow. I will, however, have to find some way of making the instructions, particularly re. engineering blocks, publicly available to hosts in the future and may establish a website for this.

Dave

Last edited: 20/11/2020 at 16:46 by DaveHarries
Reason: None given

Log in to reply
The following user said thank you: bri2808
Forthcoming Timetables 20/11/2020 at 17:02 #133995
postal
Avatar
5269 posts
DaveHarries in post 133994 said:
Quick update on my Three Bridges timetable.

I was worrying earlier in the week that I might not get around to finishing what has been my biggest TT project since I started trying to write them. However the lack of work today (Friday 20th November) has given me the chance to get more done so all I have left to write in are the trains from Sutton to Streatham Hill and the Thameslink services between Brighton and London Bridge.

At the time of writing this timetable - which is a Sunday one (22nd November) based around engineering works taking place both on and off sim - I have 1107 trains in the TT: my previous biggest TT project - an Exeter sim one - had about 425 trains! Once complete the release and testing will not be too immediate as I will have to iron out any errors, do a bit more work on making sure as many trains as possible have the correct traction allocated (most of the trains written in so far do have that, thanks to a member of the SimSig community). Once all that is done then testing and, if all goes well, release of the TT will follow. I will, however, have to find some way of making the instructions, particularly re. engineering blocks, publicly available to hosts in the future and may establish a website for this.

Dave
Write them into the Timetable Description on the front tab of the TT?

“In life, there is always someone out there, who won’t like you, for whatever reason, don’t let the insecurities in their lives affect yours.” – Rashida Rowe
Log in to reply
Forthcoming Timetables 20/11/2020 at 17:32 #133996
DaveHarries
Avatar
1287 posts
postal in post 133995 said:
Write them into the Timetable Description on the front tab of the TT?

Indeed I did consider that. It would be rather a lot of reading for the TT description box though as the times and extent of the T3 block vary during the course of the timetable. For example the Quarry Line is open during the main part of the day but is closed early on and late on in the TT.

Dave

Log in to reply
Forthcoming Timetables 21/11/2020 at 12:47 #134015
bill_gensheet
Avatar
1432 posts
A bit of a throwback method, but you could run trains into the possession and stop for the duration.

If you have a key location in there, you can also use ACI to change the TD from '6K01' to '00T3' (or similar) and back.

A fair number of possessions will have trains in anyway, but I assume yours do not or you would have found them on the RTT/OTT/Charnwood feeds

Bill

Log in to reply
Forthcoming Timetables 21/11/2020 at 13:04 #134016
BenWright
Avatar
200 posts
For my next timetable, I'll have a go at Manchester North 16th November 2020 which should include new TPE and Northern stock with new services as well as services using the Ordsall Chord
Log in to reply
Forthcoming Timetables 21/11/2020 at 16:10 #134023
haydenrobertson
Avatar
58 posts
BenWright in post 134016 said:
For my next timetable, I'll have a go at Manchester North 16th November 2020 which should include new TPE and Northern stock with new services as well as services using the Ordsall Chord

Has Manchester North been updated to have the Ordsall Chord included?

Log in to reply
Forthcoming Timetables 21/11/2020 at 16:22 #134025
Steamer
Avatar
3997 posts
Online
haydenrobertson in post 134023 said:
BenWright in post 134016 said:
For my next timetable, I'll have a go at Manchester North 16th November 2020 which should include new TPE and Northern stock with new services as well as services using the Ordsall Chord

Has Manchester North been updated to have the Ordsall Chord included?
It's been mentioned that an update is in the works, but hasn't been released yet.

"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)
Log in to reply
Forthcoming Timetables 21/11/2020 at 16:23 #134026
haydenrobertson
Avatar
58 posts
Steamer in post 134025 said:
haydenrobertson in post 134023 said:
BenWright in post 134016 said:
For my next timetable, I'll have a go at Manchester North 16th November 2020 which should include new TPE and Northern stock with new services as well as services using the Ordsall Chord

Has Manchester North been updated to have the Ordsall Chord included?
It's been mentioned that an update is in the works, but hasn't been released yet.
That's gonna be mega. Seriously looking forward to that release then.

Log in to reply
Forthcoming Timetables 21/11/2020 at 18:43 #134027
DaveHarries
Avatar
1287 posts
bill_gensheet in post 134015 said:
A bit of a throwback method, but you could run trains into the possession and stop for the duration.

If you have a key location in there, you can also use ACI to change the TD from '6K01' to '00T3' (or similar) and back.

A fair number of possessions will have trains in anyway, but I assume yours do not or you would have found them on the RTT/OTT/Charnwood feeds

Bill

Mine does have a train or two in the possession but I am unsure as to the ID of it / them and won't know that until the day itself when I look on the OTT live maps - there is a Freight (FRGT) starting from Stoats Nest according to RTT which, for the greater part of the TT and the day, is one end of the engineering block. I will likely mark the train in but forbid it from leaving until the set time although, saying that, I will have to find a way of learning what the train is comprised of.

Dave

Log in to reply
Forthcoming Timetables 22/11/2020 at 22:18 #134057
BenWright
Avatar
200 posts
I think I'll have a go at Oxted 16th November 2020 as a side project seeing as we're waiting for the Manchester North update
Log in to reply
Forthcoming Timetables 15/01/2021 at 17:35 #136433
Champs450007
Avatar
97 posts
Just resubmitted my Feltham 2020 timetable with engineering works hopefully this time it passes resubmission.
Currently working on a 2021 timetable for Wimbledon Simsig. SWR services all entered in now so the back bone of the work is done. Just need to do Southern, London Overground and If I can find them the tube train workings too.

Log in to reply
The following users said thank you: andyallen4014, Trainfan344, phil1044
Forthcoming Timetables 20/01/2021 at 13:44 #136632
03piggs
Avatar
68 posts
Hi all.

I've been for a while creating a 2013-14 timetable for Kings Cross. This will have a day of the week decisions but will be based on the wtt, not on what actually ran.

It's got no date for upload, as I need to give it another run through, but will update when it's ready.

Also been playing around with some of the bordering sims so maybe some others of the same date at some point, but they will be ready, when there ready.

Stu

Log in to reply
The following users said thank you: phil1044, as1981
Forthcoming Timetables 31/01/2021 at 13:41 #136906
NicholasN
Avatar
40 posts
I am about halfway through a new Hereford timetable, a February day last year before the Covid cutbacks, but after storms closed part of the HoW line so they terminate at either Llanwrtyd or Llandrindod instead of going through.
Certainly not a massive number of trains but it's an area where there's always something to do, covering a large area as it does, with some crossings and several loops/sidings.
Two things prevent me being able to use the same day/timetable for neighbouring areas: one is that the archive I am using only stores up to a year, the other is that freight headcodes are a headache (obfuscated or not shown), and I had to ask for some very kind help to even get the few for this one.

Log in to reply
The following user said thank you: andyallen4014
Forthcoming Timetables 31/01/2021 at 16:19 #136911
casey jones
Avatar
73 posts
iam hoping a new timetable is being done for tyneside and edinburgh my favourite sims

cheers

mick

Log in to reply
Forthcoming Timetables 31/01/2021 at 17:08 #136913
bill_gensheet
Avatar
1432 posts
casey jones in post 136911 said:
iam hoping a new timetable is being done for tyneside and edinburgh my favourite sims
cheers
mick
I have an Edinburgh 84 being tested now, chaining though is to CSCOT & Motherwell not southwards. As a 3-way chain it is a long job testing it.

Bill

Log in to reply
Forthcoming Timetables 31/01/2021 at 17:26 #136914
58050
Avatar
2660 posts
casey jones in post 136911 said:
iam hoping a new timetable is being done for tyneside and edinburgh my favourite sims

cheers

mick
I've started a Tyneside 1987/88 timetable. But at present working on a Birmingham New Street summer 1990 TT which will be part of a West Midlands set of TTs for Aston, Coventry, Saltley & Wolverhampton & should all chain. I will be doing more work on the Tyneside 87-88 TT when I get fed up working on New Street.

Last edited: 31/01/2021 at 17:26 by 58050
Reason: corrected typo

Log in to reply
The following users said thank you: tjfrancis, Splodge, haydenrobertson, bossman, whatlep
Forthcoming Timetables 31/01/2021 at 18:20 #136919
casey jones
Avatar
73 posts
58050 in post 136914 said:
casey jones in post 136911 said:
iam hoping a new timetable is being done for tyneside and edinburgh my favourite sims

cheers

mick
I've started a Tyneside 1987/88 timetable. But at present working on a Birmingham New Street summer 1990 TT which will be part of a West Midlands set of TTs for Aston, Coventry, Saltley & Wolverhampton & should all chain. I will be doing more work on the Tyneside 87-88 TT when I get fed up working on New Street.

LOOK FORWARD TO IT M8

Log in to reply
The following user said thank you: 58050
Forthcoming Timetables 31/01/2021 at 23:07 #136928
swiftaw
Avatar
271 posts
58050 in post 136914 said:
casey jones in post 136911 said:
iam hoping a new timetable is being done for tyneside and edinburgh my favourite sims

cheers

mick
I've started a Tyneside 1987/88 timetable. But at present working on a Birmingham New Street summer 1990 TT which will be part of a West Midlands set of TTs for Aston, Coventry, Saltley & Wolverhampton & should all chain. I will be doing more work on the Tyneside 87-88 TT when I get fed up working on New Street.
Love all your timetables, if you need any more testers for these I would happily volunteer my time.

Log in to reply
Forthcoming Timetables 31/01/2021 at 23:10 #136929
bnsf734
Avatar
60 posts
I have done a Manchester East 27 February 2020 timetable which links onto the Piccadilly TT already written. Standalone testing under way. I'm at 11am so far, so it shouldnt be long for a MP test.

Calvin

Log in to reply
Forthcoming Timetables 01/02/2021 at 19:37 #136946
andyallen4014
Avatar
379 posts
bnsf734 in post 136929 said:
I have done a Manchester East 27 February 2020 timetable which links onto the Piccadilly TT already written. Standalone testing under way. I'm at 11am so far, so it shouldnt be long for a MP test.

Calvin
Let me know if you need any help with that, either standalone testing or as a multi

Andy

User | Multiplayer Host | Timetable Writer
Log in to reply
Forthcoming Timetables 01/02/2021 at 20:28 #136949
phil1044
Avatar
162 posts
Online
I have a Tyneside timetable for 2018 but there are several issues on it which have been reported on Mantis but as yet not resolved.
I do have workarounds to them and notes on each train's timetable affected but I prefer to wait until they are put right as they do effect the efficient running of the TT.

Log in to reply
The following users said thank you: andyallen4014, casey jones
Forthcoming Timetables 06/04/2021 at 10:10 #138423
Splodge
Avatar
721 posts
Starting creation of an Easter Monday 2021 for Piccadilly. Still with COVID reduced timings, and some services missing due to engineering work - but also with additional freight and diversionary moves through Castlefield to keep signallers busy, and strengthened XC/TP services to ensure platforming fun and games.
There's the right way, the wrong way and the railway.
Log in to reply
Forthcoming Timetables 06/04/2021 at 10:33 #138424
andyallen4014
Avatar
379 posts
Currently under test are Sheffield and Huddersfield timetables based on 'Spring 2021' and i'm currently working on a compatible Manchester East offering. I may then radiate further with chainable timetables.
User | Multiplayer Host | Timetable Writer
Log in to reply
The following users said thank you: Mikhail, TrainMartin, phil1044
Forthcoming Timetables 06/04/2021 at 10:43 #138425
Champs450007
Avatar
97 posts
In the process of testing my Wimbledon 2021 timetable now. LUL workings are not included but Southern and all London Overground have been included. Hope to have it uploaded within the next couple of weeks.
Log in to reply
Forthcoming Timetables 06/04/2021 at 11:11 #138426
HST125Scorton
Avatar
1198 posts
Also to note there is a three day timetable in the works from myself for Warrington PSB starting on Thursday 1st and ending on Saturday 3rd April during the Easter 2021 Engineering Period.
Aaron (AJRO) | Timetable Writer
Log in to reply
The following user said thank you: 9pN1SEAp