Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Forthcoming Timetables

You are here: Home > Forum > General > Timetabling > Forthcoming Timetables

Page 23 of 31

Forthcoming Timetables 20/07/2021 at 14:01 #140663
KymriskaDraken
Avatar
963 posts
58050 in post 139971 said:
Birmingham New Street summer 1990 TT is now under test. This TT is exetremly challenging & if you play it solo you will struggle to keep everything moving. Currently there are 1,191 trains in the TT, but this number may change before release...
As a sneak preview I will be hosting a session on Thursday (2021-07-212. Details are [https://www.SimSig.co.uk/Game/Details/8186]here[/url]:



Kev

Last edited: 20/07/2021 at 20:26 by KymriskaDraken
Reason: Amended date

Log in to reply
The following users said thank you: Banners88, bossman
Forthcoming Timetables 20/07/2021 at 19:38 #140668
elltrain3
Avatar
370 posts
I'm fairly new to making FULL TTs but, I'm in the slow process of making a FULL set of Timetables for Rugby North/Centre/South Watford Junction & Wembley Mainline based on the 8th April 2015 and will be chainable with ALL surrounding sims with similar Timetables.

I'm working (more like volunteering) at Chester cathedral with the "making tracks" exhibition so am not moving quickly with my TTs though it's slowly coming on, I'm around halfway through the SB Freights with just the NB Freights to do before the initial testing and fault finding can take place on Rugby North, then I move onto Rugby centre which sadly will take even longer being there are double the services as the branch from Birmingham joins plus the complex shunting at Northampton.

(p.s. if you see any videos of the model exhibition with Pete Waterman you'll probably see me as the only young person running around in a hoodie :P)

Resident Mock Maker! / "The Out Of Control Host"
Last edited: 20/07/2021 at 19:39 by elltrain3
Reason: None given

Log in to reply
Forthcoming Timetables 21/07/2021 at 21:29 #140685
HST125Scorton
Avatar
1191 posts
Online
The following have been updated and uploaded to the timetable section.
These all now have the new set down options applied from the new loader v5.16.1

Updates as followed:
Carlisle PSB - Autumn 2016
Carlisle PSB - Summer 2017
Carlisle PSB - September 2017 - Tyne Valley Diverts
Carlisle PSB - Summer 2018
Carlisle PSB - September 2018 - Tyne Valley Diverts
Carlisle PSB - Sunday 2018
Carlisle PSB - June Two-Day 2019
Carlisle PSB - August 2020
Carlisle PSB - September 2020 - Tyne Valley Diverts
Wigan Wallgate - 19th May 2021

Aaron (AJRO) | Timetable Writer
Last edited: 21/07/2021 at 21:29 by HST125Scorton
Reason: None given

Log in to reply
Forthcoming Timetables 21/07/2021 at 23:07 #140686
Newhampshires
Avatar
101 posts
Cardiff Valleys July 16th, 2021

Release date: Late July/Early-Mid August

Last edited: 22/07/2021 at 00:54 by Newhampshires
Reason: None given

Log in to reply
Forthcoming Timetables 22/07/2021 at 20:06 #140695
Steamer
Avatar
3984 posts
I'm about to start a refresh of my Summer 2014 TTs for the South West, and also expanding the series to cover Plymouth and Penzance.
"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)
Log in to reply
Forthcoming Timetables 23/07/2021 at 14:43 #140700
HST125Scorton
Avatar
1191 posts
Online
Staffordshire 2015 (SSux) is a standard weekday timetable based on the workings in early October in 2015,
Timetable reworked, modified and re-written for use on the Staffordshire Simulation.

Now updated with new set down options features. 22-07-2021.

Aaron (AJRO) | Timetable Writer
Log in to reply
Forthcoming Timetables 30/07/2021 at 15:03 #140843
HST125Scorton
Avatar
1191 posts
Online
A quick update from myself regarding timetables and testing progress.

Completed
Carlisle PSB - 26th June 2021
Carlisle PSB - 27th June 2021

In the Works:
Staffordshire - Autumn 2021

Planned:
Edge Hill - Autumn 2021
Huyton - Autumn 2021
Manchester Piccadilly - Winter 2021
Manchester South - Summer 2021
Motherwell PSB - Winter 2021
York North & South - Winter 2021

Testing Phase:
Carlisle PSB - Summer 2021
Manchester North - Autumn 2021

Pending Simulation Updates Before Release:
Warrington PSB - Acton Grange Block 2019
Warrington PSB - Easter 2021
Warrington PSB - Summer 2021

Aaron (AJRO) | Timetable Writer
Log in to reply
Forthcoming Timetables 30/07/2021 at 16:05 #140846
bugsy
Avatar
1766 posts
Wow. You've been busy. Is tt writing one of your hobbies?
Everything that you make will be useful - providing it's made of chocolate.
Log in to reply
The following user said thank you: HST125Scorton
Forthcoming Timetables 30/07/2021 at 16:21 #140848
HST125Scorton
Avatar
1191 posts
Online
bugsy in post 140846 said:
Wow. You've been busy. Is tt writing one of your hobbies?
Writing timetables has become a thing of joyness to me, I like writing them and then letting everyone else have a share of the timetables I do make. 9 Years of been a SimSig member is a great achievement in my eyes. Plus with all this Pandemic I haven't been fully utilised and working from home, I enjoy every moment of SimSig.

Aaron (AJRO) | Timetable Writer
Log in to reply
The following users said thank you: Newhampshires, john havenhand
Forthcoming Timetables 30/07/2021 at 18:19 #140850
Meld
Avatar
1111 posts
HST125Scorton in post 140848 said:

Writing timetables has become a thing of joyness to me, I like writing them and then letting everyone else have a share of the timetables I do make. 9 Years of been a SimSig member is a great achievement in my eyes. Plus with all this Pandemic I haven't been fully utilised and working from home, I enjoy every moment of SimSig.
Its has to be a labour of love - Since Headshot asked me to produce TT's for his early sims, I've lost count of the number of TT's I've pushed out over the past few years.

Passed the age to be doing 'Spoon Feeding' !!!
Log in to reply
The following users said thank you: HST125Scorton, elltrain3
Forthcoming Timetables 30/07/2021 at 18:40 #140852
bugsy
Avatar
1766 posts
Meld in post 140850 said:
HST125Scorton in post 140848 said:

Writing timetables has become a thing of joyness to me, I like writing them and then letting everyone else have a share of the timetables I do make. 9 Years of been a SimSig member is a great achievement in my eyes. Plus with all this Pandemic I haven't been fully utilised and working from home, I enjoy every moment of SimSig.
Its has to be a labour of love - Since Headshot asked me to produce TT's for his early sims, I've lost count of the number of TT's I've pushed out over the past few years.
Well, I really admire you two guys and of course all of the other tt writers and the developers.

You give me endless hours of satisfaction whilst playing the various sims.

One thing that I really like about the latest sim release, Doncaster South, is the ability to turn TORR off. I find it much more interesting especially with delays and failures set up a bit.

Everything that you make will be useful - providing it's made of chocolate.
Log in to reply
The following user said thank you: HST125Scorton
Forthcoming Timetables 30/07/2021 at 20:40 #140855
GeoffM
Avatar
6376 posts
Online
bugsy in post 140852 said:
Meld in post 140850 said:
HST125Scorton in post 140848 said:

Writing timetables has become a thing of joyness to me, I like writing them and then letting everyone else have a share of the timetables I do make. 9 Years of been a SimSig member is a great achievement in my eyes. Plus with all this Pandemic I haven't been fully utilised and working from home, I enjoy every moment of SimSig.
Its has to be a labour of love - Since Headshot asked me to produce TT's for his early sims, I've lost count of the number of TT's I've pushed out over the past few years.
Well, I really admire you two guys and of course all of the other tt writers and the developers.

You give me endless hours of satisfaction whilst playing the various sims.

One thing that I really like about the latest sim release, Doncaster South, is the ability to turn TORR off. I find it much more interesting especially with delays and failures set up a bit.
Doncaster South is a lot more interesting than I expected. There is so much variation in service that you really have to read and memorise relevant points of several trains' schedules at once - does it stop at Retford, which order is Newark Flat Crossing, can I let that freight run early to the next loop... etc

I'm hoping we're going to get some 80s timetables too. Probably fewer passenger trains, but likely more freight - if not on Doncaster South then definitely Station and North.

SimSig Boss
Log in to reply
The following users said thank you: tjfrancis, HST125Scorton, Phil-jmw, sunocske, bugsy
Forthcoming Timetables 31/07/2021 at 00:25 #140862
jc92
Avatar
3685 posts
Online
GeoffM in post 140855 said:
bugsy in post 140852 said:
Meld in post 140850 said:
HST125Scorton in post 140848 said:

Writing timetables has become a thing of joyness to me, I like writing them and then letting everyone else have a share of the timetables I do make. 9 Years of been a SimSig member is a great achievement in my eyes. Plus with all this Pandemic I haven't been fully utilised and working from home, I enjoy every moment of SimSig.
Its has to be a labour of love - Since Headshot asked me to produce TT's for his early sims, I've lost count of the number of TT's I've pushed out over the past few years.
Well, I really admire you two guys and of course all of the other tt writers and the developers.

You give me endless hours of satisfaction whilst playing the various sims.

One thing that I really like about the latest sim release, Doncaster South, is the ability to turn TORR off. I find it much more interesting especially with delays and failures set up a bit.
Doncaster South is a lot more interesting than I expected. There is so much variation in service that you really have to read and memorise relevant points of several trains' schedules at once - does it stop at Retford, which order is Newark Flat Crossing, can I let that freight run early to the next loop... etc

I'm hoping we're going to get some 80s timetables too. Probably fewer passenger trains, but likely more freight - if not on Doncaster South then definitely Station and North.
Panels 2, 4 & 5 should end up being particularly busy handling all the MGR traffic through Decoy Yards, the SYJ line and out to Immingham and West Yorkshire as well which is all now consigned to history. Will we one day see a 1991 chain from Grantham to Northallerton and Wakefield?

"We don't stop camborne wednesdays"
Log in to reply
The following users said thank you: elltrain3, sunocske, tjfrancis
Forthcoming Timetables 31/07/2021 at 09:22 #140864
bugsy
Avatar
1766 posts
I hope that we see some timetables from the earlier eras when all of the now obsolete lines were still operational. Were there even coal trains?
Everything that you make will be useful - providing it's made of chocolate.
Log in to reply
Forthcoming Timetables 31/07/2021 at 10:15 #140866
bill_gensheet
Avatar
1413 posts
GeoffM in post 140855 said:
[quote=bugsy;post=140852][quote=Meld;post=140850][quote=HST125Scorton;post=140848]

I'm hoping we're going to get some 80s timetables too. Probably fewer passenger trains, but likely more freight - if not on Doncaster South then definitely Station and North.
Indeed, hopefully some of the usual TT folks have the answers.

More widely when dealing with 'hiistoricals' many shorter distance freight trains, and particularly coal, were not in the WTT. They were either in trip notices or 'coal plans'. That means that 4 concurrent documents are needed, with less scope to get by on the usual two plus educated guesses / photos / 'net wibble.

Just if anyone is bidding on WTT's etc on eBay, let everyone know so people do not end up bidding against each other !

Bill

Log in to reply
Forthcoming Timetables 02/08/2021 at 12:36 #140916
GW43125
Avatar
495 posts
Wimbledon January 2019 currently has all SWR trains in, these are being tested and tweaked before I add the freight, Overground, Southern and Underground services. No release date as of yet due to life getting in the way but I can assure you it won't get parked indefinitely, and is very much active.

The chainable Horsham 2019 (which I hope to be able to chain with the extant Three Bridges of the same date), is now at the bottom of the pile due to becoming corrupted (yes, I learned my lesson and there are now two backups), and will be written after Wimbledon but should only take about a week to do once I get round to it.

Ok nevermind, it turns out there's already a January 2019 Horsham timetable so there's no action needed from me on that one.

Jamie

Last edited: 02/08/2021 at 13:23 by GW43125
Reason: None given

Log in to reply
Forthcoming Timetables 02/08/2021 at 13:52 #140918
58050
Avatar
2659 posts
GeoffM in post 140855 said:
bugsy in post 140852 said:
Meld in post 140850 said:
HST125Scorton in post 140848 said:

Writing timetables has become a thing of joyness to me, I like writing them and then letting everyone else have a share of the timetables I do make. 9 Years of been a SimSig member is a great achievement in my eyes. Plus with all this Pandemic I haven't been fully utilised and working from home, I enjoy every moment of SimSig.
Its has to be a labour of love - Since Headshot asked me to produce TT's for his early sims, I've lost count of the number of TT's I've pushed out over the past few years.
Well, I really admire you two guys and of course all of the other tt writers and the developers.

You give me endless hours of satisfaction whilst playing the various sims.

One thing that I really like about the latest sim release, Doncaster South, is the ability to turn TORR off. I find it much more interesting especially with delays and failures set up a bit.
Doncaster South is a lot more interesting than I expected. There is so much variation in service that you really have to read and memorise relevant points of several trains' schedules at once - does it stop at Retford, which order is Newark Flat Crossing, can I let that freight run early to the next loop... etc

I'm hoping we're going to get some 80s timetables too. Probably fewer passenger trains, but likely more freight - if not on Doncaster South then definitely Station and North.
The first set of timetables I will write for the Doncaster sims will be a 1991 TT to chain with West Yorkshire & York North/South 1991 TTs, although some updating will be required on those. But with regards to the 1980s I've started a Tyneside 1987-1988 TT & will continue that southwards at some point taking in York North/South, West Yorkshire, Peterborough & the Doncaster sims too. I've got an MGR coal plan too that covers the late 1980s as well as some MGR coal plans f0r the Worksop & East Midlands areas. As already mentioned on here the majority of MGR trains run as trips & coal plans changed every week subject to the amount of coal required by the power stations to produce electricty & the amount of coal collieries could produce & no coal plan was identical as the tonnages changed weekly. Some MGR workings such as those from the East & West Midlands do appear in the WTTs & there's quite alot of them in the summer 1990 TTs I'm currently writing. But as ever these BR era TTs take a long time to write & test so users are going to have to bear with me on this one. That said the Birmingham New Street summer 1990 TT is still under test & atm I'm writing Coventry summer 1990 to chain with New Street, then it will be Wolverhampton summer 1990 & lastly Saltley summer 1990. But I can assure users that there is plenty of freight traffic on the summer 1990 TTs, probably alot more than you think if you were around then.

Log in to reply
The following users said thank you: JamesDaniel, postal, bossman, haydenrobertson, ajax103, Phil-jmw, 47417, tjfrancis
Forthcoming Timetables 15/08/2021 at 21:11 #141168
HST125Scorton
Avatar
1191 posts
Online
Last update for me until Mid-September. So progression has been made virtually non stop, with some sleepless nights due to my health where I can't sleep timetables are flying along at a rate I've never done before. I'm now taking a few weeks away from SimSig to relax and have some time to myself. I'm taking myself to The Sidings Hotel near York 16th-20th August so plenty of relaxation and note taking for York.

Completed and will be uploaded soon:
Carlisle PSB - 26th June 2021
Carlisle PSB - 27th June 2021
Manchester North - Autumn 2021

In the Works:
Edge Hill - Autumn 2021 - Freight to add
Huyton - Autumn 2021 - Freight to add
Manchester South - Autumn 2021

Planned:
Manchester Piccadilly - Winter 2021
Motherwell PSB - Winter 2021
York North & South - Winter 2021

Testing Phase:
Carlisle PSB - Summer 2021
Staffordshire - Autumn 2021


Pending Simulation Updates Before Release:
Warrington PSB - Acton Grange Block 2019
Warrington PSB - Easter 2021
Warrington PSB - Summer 2021

Aaron (AJRO) | Timetable Writer
Last edited: 15/08/2021 at 21:13 by HST125Scorton
Reason: None given

Log in to reply
The following users said thank you: bossman, ajax103
Forthcoming Timetables 17/08/2021 at 17:21 #141182
swiftaw
Avatar
271 posts
58050 in post 140918 said:
GeoffM in post 140855 said:
bugsy in post 140852 said:
Meld in post 140850 said:
HST125Scorton in post 140848 said:

Writing timetables has become a thing of joyness to me, I like writing them and then letting everyone else have a share of the timetables I do make. 9 Years of been a SimSig member is a great achievement in my eyes. Plus with all this Pandemic I haven't been fully utilised and working from home, I enjoy every moment of SimSig.
Its has to be a labour of love - Since Headshot asked me to produce TT's for his early sims, I've lost count of the number of TT's I've pushed out over the past few years.
Well, I really admire you two guys and of course all of the other tt writers and the developers.

You give me endless hours of satisfaction whilst playing the various sims.

One thing that I really like about the latest sim release, Doncaster South, is the ability to turn TORR off. I find it much more interesting especially with delays and failures set up a bit.
Doncaster South is a lot more interesting than I expected. There is so much variation in service that you really have to read and memorise relevant points of several trains' schedules at once - does it stop at Retford, which order is Newark Flat Crossing, can I let that freight run early to the next loop... etc

I'm hoping we're going to get some 80s timetables too. Probably fewer passenger trains, but likely more freight - if not on Doncaster South then definitely Station and North.
The first set of timetables I will write for the Doncaster sims will be a 1991 TT to chain with West Yorkshire & York North/South 1991 TTs, although some updating will be required on those. But with regards to the 1980s I've started a Tyneside 1987-1988 TT & will continue that southwards at some point taking in York North/South, West Yorkshire, Peterborough & the Doncaster sims too. I've got an MGR coal plan too that covers the late 1980s as well as some MGR coal plans f0r the Worksop & East Midlands areas. As already mentioned on here the majority of MGR trains run as trips & coal plans changed every week subject to the amount of coal required by the power stations to produce electricty & the amount of coal collieries could produce & no coal plan was identical as the tonnages changed weekly. Some MGR workings such as those from the East & West Midlands do appear in the WTTs & there's quite alot of them in the summer 1990 TTs I'm currently writing. But as ever these BR era TTs take a long time to write & test so users are going to have to bear with me on this one. That said the Birmingham New Street summer 1990 TT is still under test & atm I'm writing Coventry summer 1990 to chain with New Street, then it will be Wolverhampton summer 1990 & lastly Saltley summer 1990. But I can assure users that there is plenty of freight traffic on the summer 1990 TTs, probably alot more than you think if you were around then.
Can't wait, love your timetables. Any ETA on New Street?

Log in to reply
The following user said thank you: haydenrobertson
Forthcoming Timetables 30/08/2021 at 19:47 #141424
andyallen4014
Avatar
371 posts
Currently working on various Saturday timetables dated 28/08/21, these will appear for various sims and it's planned that timetables for neighboring sims will be chainable.

Under final testing at the moment is the initial 28/08/21 release, Sheffield. Also being worked on at the moment are Derby and Leeds Ardsley with more to follow.

User | Multiplayer Host | Timetable Writer
Log in to reply
Forthcoming Timetables 31/08/2021 at 12:57 #141431
58050
Avatar
2659 posts
Part 2 of the West Midlands Chain TTs is now under testing. Coventry summer 1990 may get released before the Birmingham New Street summer 1990 TT as it can't be released until all the issues raised on MANTIS have been fixed & the new updated sim version is released. Part 3 of the summer 1990 TTs Wolverhampton is what I'm now working on for those interested in this set of timetables.
Log in to reply
The following users said thank you: HST125Scorton, rodney30, haydenrobertson, JamesDaniel, Phil-jmw, bossman, ccobh, ajax103, sunocske, Mikhail
Forthcoming Timetables 11/09/2021 at 18:00 #141521
Champs450007
Avatar
97 posts
Finally have gotten round to uploading my Wimbledon Simsig timetable, set in Jan 2021. One or two issues I'm aware of in terms of trains losing ARS or passing trains where they shouldn't but the timetable is 99%. Just awaiting approval now.
Log in to reply
Forthcoming Timetables 28/09/2021 at 10:46 #141708
HST125Scorton
Avatar
1191 posts
Online
A quick update regarding timetable, a lot of testing has been done since my last update and also a couple of new timetables have been uploaded. Due to time constraints I had to removed the planned Manchester Piccadilly & Huyton timetables. My Warrington timetables are just awaiting an update on the sim to allow run round procedures at the Mail Terminal, once this has been sorted the timetables will be updated and uploaded.

Completed and will be uploaded soon:
Manchester North - Autumn 2021
Staffordshire - Autumn 2021

In the Works:


Planned:
Motherwell PSB - Winter 2021
York North & South - Winter 2021

Testing Phase:
Manchester South - Autumn 2021
Edge Hill - Autumn 2021
Carlisle PSB - Summer 2021 - Version 1.1
Carlisle 26th June 2021 - Version 1.2
Carlisle 27th June 2021 - Version 1.1


Pending Simulation Updates Before Release:
Warrington PSB - Acton Grange Block 2019
Warrington PSB - Easter 2021
Warrington PSB - Summer 2021

Aaron (AJRO) | Timetable Writer
Last edited: 28/09/2021 at 19:13 by HST125Scorton
Reason: None given

Log in to reply
The following users said thank you: bossman, JamesDaniel, Newhampshires
Forthcoming Timetables 14/10/2021 at 17:48 #141863
Newhampshires
Avatar
101 posts
Marylebone - September 2021 (No London Underground services will be featured - At first )

Release date: November 2021

Last edited: 14/10/2021 at 17:49 by Newhampshires
Reason: None given

Log in to reply
The following users said thank you: Dionysusnu, Mikhail
Forthcoming Timetables 14/10/2021 at 20:31 #141867
HST125Scorton
Avatar
1191 posts
Online
A quick update regarding timetables, a lot of testing has been done since my last update and also a couple of new timetables have been uploaded. My Warrington timetables are just awaiting an update on the sim to allow run round procedures at the Mail Terminal, once this has been sorted the timetables will be updated and uploaded. Without mentioning I have also released to upload Carlisle Tyne Valley Diverts 2021 this one only took around a month to write and test. Staffordshire has gone back into testing as I made quite a selection of changes to various services and at present is testing well for a release by the end of this month.

Completed and to be uploaded soon:
Manchester North - Autumn 2021

In the Works:
Rugby Centre - Winter 2021

Planned:
Motherwell PSB - Winter 2021
York North & South - Winter 2021

Testing Phase:
Edge Hill - Autumn 2021
Manchester South - Autumn 2021
Staffordshire - Autumn 2021

Pending Simulation Updates Before Release:
Warrington PSB - Acton Grange Block 2019
Warrington PSB - Easter 2021
Warrington PSB - Summer 2021

Aaron (AJRO) | Timetable Writer
Last edited: 14/10/2021 at 20:31 by HST125Scorton
Reason: None given

Log in to reply
The following users said thank you: Newhampshires, JamesDaniel, bossman