Page 23 of 31
Forthcoming Timetables 20/07/2021 at 14:01 #140663 | |
KymriskaDraken
963 posts |
58050 in post 139971 said:Birmingham New Street summer 1990 TT is now under test. This TT is exetremly challenging & if you play it solo you will struggle to keep everything moving. Currently there are 1,191 trains in the TT, but this number may change before release...As a sneak preview I will be hosting a session on Thursday (2021-07-212. Details are [https://www.SimSig.co.uk/Game/Details/8186]here[/url]: Kev Last edited: 20/07/2021 at 20:26 by KymriskaDraken Reason: Amended date Log in to reply The following users said thank you: Banners88, bossman |
Forthcoming Timetables 20/07/2021 at 19:38 #140668 | |
elltrain3
369 posts |
I'm fairly new to making FULL TTs but, I'm in the slow process of making a FULL set of Timetables for Rugby North/Centre/South Watford Junction & Wembley Mainline based on the 8th April 2015 and will be chainable with ALL surrounding sims with similar Timetables. I'm working (more like volunteering) at Chester cathedral with the "making tracks" exhibition so am not moving quickly with my TTs though it's slowly coming on, I'm around halfway through the SB Freights with just the NB Freights to do before the initial testing and fault finding can take place on Rugby North, then I move onto Rugby centre which sadly will take even longer being there are double the services as the branch from Birmingham joins plus the complex shunting at Northampton. (p.s. if you see any videos of the model exhibition with Pete Waterman you'll probably see me as the only young person running around in a hoodie :P) Resident Mock Maker! / "The Out Of Control Host" Last edited: 20/07/2021 at 19:39 by elltrain3 Reason: None given Log in to reply |
Forthcoming Timetables 21/07/2021 at 21:29 #140685 | |
HST125Scorton
1191 posts |
The following have been updated and uploaded to the timetable section. These all now have the new set down options applied from the new loader v5.16.1 Updates as followed: Carlisle PSB - Autumn 2016 Carlisle PSB - Summer 2017 Carlisle PSB - September 2017 - Tyne Valley Diverts Carlisle PSB - Summer 2018 Carlisle PSB - September 2018 - Tyne Valley Diverts Carlisle PSB - Sunday 2018 Carlisle PSB - June Two-Day 2019 Carlisle PSB - August 2020 Carlisle PSB - September 2020 - Tyne Valley Diverts Wigan Wallgate - 19th May 2021 Aaron (AJRO) | Timetable Writer Last edited: 21/07/2021 at 21:29 by HST125Scorton Reason: None given Log in to reply |
Forthcoming Timetables 21/07/2021 at 23:07 #140686 | |
Newhampshires
101 posts |
Cardiff Valleys July 16th, 2021 Release date: Late July/Early-Mid August Last edited: 22/07/2021 at 00:54 by Newhampshires Reason: None given Log in to reply |
Forthcoming Timetables 22/07/2021 at 20:06 #140695 | |
Steamer
3984 posts |
I'm about to start a refresh of my Summer 2014 TTs for the South West, and also expanding the series to cover Plymouth and Penzance.
"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q) Log in to reply |
Forthcoming Timetables 23/07/2021 at 14:43 #140700 | |
HST125Scorton
1191 posts |
Staffordshire 2015 (SSux) is a standard weekday timetable based on the workings in early October in 2015, Timetable reworked, modified and re-written for use on the Staffordshire Simulation. Now updated with new set down options features. 22-07-2021. Aaron (AJRO) | Timetable Writer Log in to reply |
Forthcoming Timetables 30/07/2021 at 15:03 #140843 | |
HST125Scorton
1191 posts |
A quick update from myself regarding timetables and testing progress. Completed Carlisle PSB - 26th June 2021 Carlisle PSB - 27th June 2021 In the Works: Staffordshire - Autumn 2021 Planned: Edge Hill - Autumn 2021 Huyton - Autumn 2021 Manchester Piccadilly - Winter 2021 Manchester South - Summer 2021 Motherwell PSB - Winter 2021 York North & South - Winter 2021 Testing Phase: Carlisle PSB - Summer 2021 Manchester North - Autumn 2021 Pending Simulation Updates Before Release: Warrington PSB - Acton Grange Block 2019 Warrington PSB - Easter 2021 Warrington PSB - Summer 2021 Aaron (AJRO) | Timetable Writer Log in to reply |
Forthcoming Timetables 30/07/2021 at 16:05 #140846 | |
bugsy
1766 posts |
Wow. You've been busy. Is tt writing one of your hobbies?
Everything that you make will be useful - providing it's made of chocolate. Log in to reply The following user said thank you: HST125Scorton |
Forthcoming Timetables 30/07/2021 at 16:21 #140848 | |
HST125Scorton
1191 posts |
bugsy in post 140846 said:Wow. You've been busy. Is tt writing one of your hobbies?Writing timetables has become a thing of joyness to me, I like writing them and then letting everyone else have a share of the timetables I do make. 9 Years of been a SimSig member is a great achievement in my eyes. Plus with all this Pandemic I haven't been fully utilised and working from home, I enjoy every moment of SimSig. Aaron (AJRO) | Timetable Writer Log in to reply The following users said thank you: Newhampshires, john havenhand |
Forthcoming Timetables 30/07/2021 at 18:19 #140850 | |
Meld
1111 posts |
HST125Scorton in post 140848 said:Its has to be a labour of love - Since Headshot asked me to produce TT's for his early sims, I've lost count of the number of TT's I've pushed out over the past few years. Passed the age to be doing 'Spoon Feeding' !!! Log in to reply The following users said thank you: HST125Scorton, elltrain3 |
Forthcoming Timetables 30/07/2021 at 18:40 #140852 | |
bugsy
1766 posts |
Meld in post 140850 said:HST125Scorton in post 140848 said:Well, I really admire you two guys and of course all of the other tt writers and the developers.Its has to be a labour of love - Since Headshot asked me to produce TT's for his early sims, I've lost count of the number of TT's I've pushed out over the past few years. You give me endless hours of satisfaction whilst playing the various sims. One thing that I really like about the latest sim release, Doncaster South, is the ability to turn TORR off. I find it much more interesting especially with delays and failures set up a bit. Everything that you make will be useful - providing it's made of chocolate. Log in to reply The following user said thank you: HST125Scorton |
Forthcoming Timetables 30/07/2021 at 20:40 #140855 | |
GeoffM
6376 posts |
bugsy in post 140852 said:Meld in post 140850 said:Doncaster South is a lot more interesting than I expected. There is so much variation in service that you really have to read and memorise relevant points of several trains' schedules at once - does it stop at Retford, which order is Newark Flat Crossing, can I let that freight run early to the next loop... etcHST125Scorton in post 140848 said:Well, I really admire you two guys and of course all of the other tt writers and the developers.Its has to be a labour of love - Since Headshot asked me to produce TT's for his early sims, I've lost count of the number of TT's I've pushed out over the past few years. I'm hoping we're going to get some 80s timetables too. Probably fewer passenger trains, but likely more freight - if not on Doncaster South then definitely Station and North. SimSig Boss Log in to reply The following users said thank you: tjfrancis, HST125Scorton, Phil-jmw, sunocske, bugsy |
Forthcoming Timetables 31/07/2021 at 00:25 #140862 | |
jc92
3685 posts |
GeoffM in post 140855 said:bugsy in post 140852 said:Panels 2, 4 & 5 should end up being particularly busy handling all the MGR traffic through Decoy Yards, the SYJ line and out to Immingham and West Yorkshire as well which is all now consigned to history. Will we one day see a 1991 chain from Grantham to Northallerton and Wakefield?Meld in post 140850 said:Doncaster South is a lot more interesting than I expected. There is so much variation in service that you really have to read and memorise relevant points of several trains' schedules at once - does it stop at Retford, which order is Newark Flat Crossing, can I let that freight run early to the next loop... etcHST125Scorton in post 140848 said:Well, I really admire you two guys and of course all of the other tt writers and the developers.Its has to be a labour of love - Since Headshot asked me to produce TT's for his early sims, I've lost count of the number of TT's I've pushed out over the past few years. "We don't stop camborne wednesdays" Log in to reply The following users said thank you: elltrain3, sunocske, tjfrancis |
Forthcoming Timetables 31/07/2021 at 09:22 #140864 | |
bugsy
1766 posts |
I hope that we see some timetables from the earlier eras when all of the now obsolete lines were still operational. Were there even coal trains?
Everything that you make will be useful - providing it's made of chocolate. Log in to reply |
Forthcoming Timetables 31/07/2021 at 10:15 #140866 | |
bill_gensheet
1413 posts |
GeoffM in post 140855 said:[quote=bugsy;post=140852][quote=Meld;post=140850][quote=HST125Scorton;post=140848]Indeed, hopefully some of the usual TT folks have the answers. More widely when dealing with 'hiistoricals' many shorter distance freight trains, and particularly coal, were not in the WTT. They were either in trip notices or 'coal plans'. That means that 4 concurrent documents are needed, with less scope to get by on the usual two plus educated guesses / photos / 'net wibble. Just if anyone is bidding on WTT's etc on eBay, let everyone know so people do not end up bidding against each other ! Bill Log in to reply |
Forthcoming Timetables 02/08/2021 at 12:36 #140916 | |
GW43125
495 posts |
Wimbledon January 2019 currently has all SWR trains in, these are being tested and tweaked before I add the freight, Overground, Southern and Underground services. No release date as of yet due to life getting in the way but I can assure you it won't get parked indefinitely, and is very much active. The chainable Horsham 2019 (which I hope to be able to chain with the extant Three Bridges of the same date), is now at the bottom of the pile due to becoming corrupted (yes, I learned my lesson and there are now two backups), and will be written after Wimbledon but should only take about a week to do once I get round to it. Ok nevermind, it turns out there's already a January 2019 Horsham timetable so there's no action needed from me on that one. Jamie Last edited: 02/08/2021 at 13:23 by GW43125 Reason: None given Log in to reply |
Forthcoming Timetables 02/08/2021 at 13:52 #140918 | |
58050
2659 posts |
GeoffM in post 140855 said:bugsy in post 140852 said:The first set of timetables I will write for the Doncaster sims will be a 1991 TT to chain with West Yorkshire & York North/South 1991 TTs, although some updating will be required on those. But with regards to the 1980s I've started a Tyneside 1987-1988 TT & will continue that southwards at some point taking in York North/South, West Yorkshire, Peterborough & the Doncaster sims too. I've got an MGR coal plan too that covers the late 1980s as well as some MGR coal plans f0r the Worksop & East Midlands areas. As already mentioned on here the majority of MGR trains run as trips & coal plans changed every week subject to the amount of coal required by the power stations to produce electricty & the amount of coal collieries could produce & no coal plan was identical as the tonnages changed weekly. Some MGR workings such as those from the East & West Midlands do appear in the WTTs & there's quite alot of them in the summer 1990 TTs I'm currently writing. But as ever these BR era TTs take a long time to write & test so users are going to have to bear with me on this one. That said the Birmingham New Street summer 1990 TT is still under test & atm I'm writing Coventry summer 1990 to chain with New Street, then it will be Wolverhampton summer 1990 & lastly Saltley summer 1990. But I can assure users that there is plenty of freight traffic on the summer 1990 TTs, probably alot more than you think if you were around then.Meld in post 140850 said:Doncaster South is a lot more interesting than I expected. There is so much variation in service that you really have to read and memorise relevant points of several trains' schedules at once - does it stop at Retford, which order is Newark Flat Crossing, can I let that freight run early to the next loop... etcHST125Scorton in post 140848 said:Well, I really admire you two guys and of course all of the other tt writers and the developers.Its has to be a labour of love - Since Headshot asked me to produce TT's for his early sims, I've lost count of the number of TT's I've pushed out over the past few years. Log in to reply The following users said thank you: JamesDaniel, postal, bossman, haydenrobertson, ajax103, Phil-jmw, 47417, tjfrancis |
Forthcoming Timetables 15/08/2021 at 21:11 #141168 | |
HST125Scorton
1191 posts |
Last update for me until Mid-September. So progression has been made virtually non stop, with some sleepless nights due to my health where I can't sleep timetables are flying along at a rate I've never done before. I'm now taking a few weeks away from SimSig to relax and have some time to myself. I'm taking myself to The Sidings Hotel near York 16th-20th August so plenty of relaxation and note taking for York. Completed and will be uploaded soon: Carlisle PSB - 26th June 2021 Carlisle PSB - 27th June 2021 Manchester North - Autumn 2021 In the Works: Edge Hill - Autumn 2021 - Freight to add Huyton - Autumn 2021 - Freight to add Manchester South - Autumn 2021 Planned: Manchester Piccadilly - Winter 2021 Motherwell PSB - Winter 2021 York North & South - Winter 2021 Testing Phase: Carlisle PSB - Summer 2021 Staffordshire - Autumn 2021 Pending Simulation Updates Before Release: Warrington PSB - Acton Grange Block 2019 Warrington PSB - Easter 2021 Warrington PSB - Summer 2021 Aaron (AJRO) | Timetable Writer Last edited: 15/08/2021 at 21:13 by HST125Scorton Reason: None given Log in to reply The following users said thank you: bossman, ajax103 |
Forthcoming Timetables 17/08/2021 at 17:21 #141182 | |
swiftaw
271 posts |
58050 in post 140918 said:GeoffM in post 140855 said:Can't wait, love your timetables. Any ETA on New Street?bugsy in post 140852 said:The first set of timetables I will write for the Doncaster sims will be a 1991 TT to chain with West Yorkshire & York North/South 1991 TTs, although some updating will be required on those. But with regards to the 1980s I've started a Tyneside 1987-1988 TT & will continue that southwards at some point taking in York North/South, West Yorkshire, Peterborough & the Doncaster sims too. I've got an MGR coal plan too that covers the late 1980s as well as some MGR coal plans f0r the Worksop & East Midlands areas. As already mentioned on here the majority of MGR trains run as trips & coal plans changed every week subject to the amount of coal required by the power stations to produce electricty & the amount of coal collieries could produce & no coal plan was identical as the tonnages changed weekly. Some MGR workings such as those from the East & West Midlands do appear in the WTTs & there's quite alot of them in the summer 1990 TTs I'm currently writing. But as ever these BR era TTs take a long time to write & test so users are going to have to bear with me on this one. That said the Birmingham New Street summer 1990 TT is still under test & atm I'm writing Coventry summer 1990 to chain with New Street, then it will be Wolverhampton summer 1990 & lastly Saltley summer 1990. But I can assure users that there is plenty of freight traffic on the summer 1990 TTs, probably alot more than you think if you were around then.Meld in post 140850 said:Doncaster South is a lot more interesting than I expected. There is so much variation in service that you really have to read and memorise relevant points of several trains' schedules at once - does it stop at Retford, which order is Newark Flat Crossing, can I let that freight run early to the next loop... etcHST125Scorton in post 140848 said:Well, I really admire you two guys and of course all of the other tt writers and the developers.Its has to be a labour of love - Since Headshot asked me to produce TT's for his early sims, I've lost count of the number of TT's I've pushed out over the past few years. Log in to reply The following user said thank you: haydenrobertson |
Forthcoming Timetables 30/08/2021 at 19:47 #141424 | |
andyallen4014
371 posts |
Currently working on various Saturday timetables dated 28/08/21, these will appear for various sims and it's planned that timetables for neighboring sims will be chainable. Under final testing at the moment is the initial 28/08/21 release, Sheffield. Also being worked on at the moment are Derby and Leeds Ardsley with more to follow. User | Multiplayer Host | Timetable Writer Log in to reply |
Forthcoming Timetables 31/08/2021 at 12:57 #141431 | |
58050
2659 posts |
Part 2 of the West Midlands Chain TTs is now under testing. Coventry summer 1990 may get released before the Birmingham New Street summer 1990 TT as it can't be released until all the issues raised on MANTIS have been fixed & the new updated sim version is released. Part 3 of the summer 1990 TTs Wolverhampton is what I'm now working on for those interested in this set of timetables.
Log in to reply The following users said thank you: HST125Scorton, rodney30, haydenrobertson, JamesDaniel, Phil-jmw, bossman, ccobh, ajax103, sunocske, Mikhail |
Forthcoming Timetables 11/09/2021 at 18:00 #141521 | |
Champs450007
97 posts |
Finally have gotten round to uploading my Wimbledon Simsig timetable, set in Jan 2021. One or two issues I'm aware of in terms of trains losing ARS or passing trains where they shouldn't but the timetable is 99%. Just awaiting approval now.
Log in to reply |
Forthcoming Timetables 28/09/2021 at 10:46 #141708 | |
HST125Scorton
1191 posts |
A quick update regarding timetable, a lot of testing has been done since my last update and also a couple of new timetables have been uploaded. Due to time constraints I had to removed the planned Manchester Piccadilly & Huyton timetables. My Warrington timetables are just awaiting an update on the sim to allow run round procedures at the Mail Terminal, once this has been sorted the timetables will be updated and uploaded. Completed and will be uploaded soon: Manchester North - Autumn 2021 Staffordshire - Autumn 2021 In the Works: Planned: Motherwell PSB - Winter 2021 York North & South - Winter 2021 Testing Phase: Manchester South - Autumn 2021 Edge Hill - Autumn 2021 Carlisle PSB - Summer 2021 - Version 1.1 Carlisle 26th June 2021 - Version 1.2 Carlisle 27th June 2021 - Version 1.1 Pending Simulation Updates Before Release: Warrington PSB - Acton Grange Block 2019 Warrington PSB - Easter 2021 Warrington PSB - Summer 2021 Aaron (AJRO) | Timetable Writer Last edited: 28/09/2021 at 19:13 by HST125Scorton Reason: None given Log in to reply The following users said thank you: bossman, JamesDaniel, Newhampshires |
Forthcoming Timetables 14/10/2021 at 17:48 #141863 | |
Newhampshires
101 posts |
Marylebone - September 2021 (No London Underground services will be featured - At first ) Release date: November 2021 Last edited: 14/10/2021 at 17:49 by Newhampshires Reason: None given Log in to reply The following users said thank you: Dionysusnu, Mikhail |
Forthcoming Timetables 14/10/2021 at 20:31 #141867 | |
HST125Scorton
1191 posts |
A quick update regarding timetables, a lot of testing has been done since my last update and also a couple of new timetables have been uploaded. My Warrington timetables are just awaiting an update on the sim to allow run round procedures at the Mail Terminal, once this has been sorted the timetables will be updated and uploaded. Without mentioning I have also released to upload Carlisle Tyne Valley Diverts 2021 this one only took around a month to write and test. Staffordshire has gone back into testing as I made quite a selection of changes to various services and at present is testing well for a release by the end of this month. Completed and to be uploaded soon: Manchester North - Autumn 2021 In the Works: Rugby Centre - Winter 2021 Planned: Motherwell PSB - Winter 2021 York North & South - Winter 2021 Testing Phase: Edge Hill - Autumn 2021 Manchester South - Autumn 2021 Staffordshire - Autumn 2021 Pending Simulation Updates Before Release: Warrington PSB - Acton Grange Block 2019 Warrington PSB - Easter 2021 Warrington PSB - Summer 2021 Aaron (AJRO) | Timetable Writer Last edited: 14/10/2021 at 20:31 by HST125Scorton Reason: None given Log in to reply The following users said thank you: Newhampshires, JamesDaniel, bossman |