Page 1 of 1
ACoA at Somerton Siding 24/05/2021 at 19:08 #139715 | |
Gwasanaethau
509 posts |
Hi all! Hope you are all well! I have a bit of a problem getting 7V10 (Project X timetable) out of the siding at Somerton. I have performed the operations as outlined in the wiki, but it seems the hand-signal timer isn't long enough to allow the train to leave the siding. Each time the hand-signalperson stops waving, the driver complains of an ACoA at the signal. Would it be possible to extend this timer just a little bit to avoid the "will they make it?" -> ACoA -> On telephone -> hand-signal -> "will they make it?" loop from occurring? Thanks a mill! Mark (Gwasanaethau) Log in to reply |
ACoA at Somerton Siding 24/05/2021 at 20:16 #139718 | |
bill_gensheet
1413 posts |
As posted elsewhere I belive a modification is happening. It is also possible to keep waving the flag by keep clicking it until the train appears in sim on a TC. Bill Log in to reply The following user said thank you: Gwasanaethau |
ACoA at Somerton Siding 24/05/2021 at 23:16 #139719 | |
headshot119
4869 posts |
I've raised Mantis 33755 to standardise the type of handsignal control to prevent this problem.
"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer Log in to reply The following user said thank you: Gwasanaethau |