Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Castleford P2

You are here: Home > Forum > Miscellaneous > The real thing (signalling) > Castleford P2

Page 1 of 1

Castleford P2 01/10/2023 at 19:09 #153490
9pN1SEAp
Avatar
1180 posts
Hi,

I note there are are a number of ECS workings (e.g. 5T64) which are timed to stop at Castleford P2 and occupy that platform during the time that reversals on P1 are planned.

However this requires the block in advance of CD668 to be occupied and this would in turn lock the relevant track sections for the passenger move.

Was this area resignalled after the date of the WY sim to resite the signal or to add a shunt block? And does anyone have information about what work was done and when?

Thanks
Jamie

Jamie S (JAMS)
Log in to reply
Castleford P2 01/10/2023 at 19:21 #153491
headshot119
Avatar
4869 posts
I don't believe any signaling changes have taken place at Castleford, although I'd happily stand corrected if some have happened.

Nothing looks to be booked to use platform 2 yet in passenger service, so I suspect the reality is the train is held back at CD668 until closer to booked departure time.

"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Log in to reply
Castleford P2 01/10/2023 at 19:23 #153492
jc92
Avatar
3685 posts
Trains timed to stop at Castleford like the example you gave normally sit north of the station rather than in it at CD668. I assume there's no suitable TIPLOC for that signal for planning purposes.
"We don't stop camborne wednesdays"
Log in to reply
The following user said thank you: 9pN1SEAp
Castleford P2 01/10/2023 at 21:14 #153493
9pN1SEAp
Avatar
1180 posts
Thanks both! I'll use regulating stop in my TT, as you say there's no TIPLOC for CD668.
Jamie S (JAMS)
Last edited: 01/10/2023 at 21:34 by 9pN1SEAp
Reason: tyop

Log in to reply
Castleford P2 01/10/2023 at 22:14 #153496
Dionysusnu
Avatar
577 posts
Online
headshot119 in post 153491 said:
I don't believe any signaling changes have taken place at Castleford, although I'd happily stand corrected if some have happened.

Nothing looks to be booked to use platform 2 yet in passenger service, so I suspect the reality is the train is held back at CD668 until closer to booked departure time.
Roughly during October 2022, a crossover was added from the Up Cutsyke to the Down Cutsyke, and Castleford platform 2 was made bi-directional.
This video seems to also show a new starter signal at the end of platform 2.

Last edited: 01/10/2023 at 22:30 by Dionysusnu
Reason: None given

Log in to reply