Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Starting at P8

You are here: Home > Forum > Simulations > Released > Sheffield (ROC) > Starting at P8

Page 1 of 1

Starting at P8 01/07/2024 at 18:41 #157714
9pN1SEAp
Avatar
1180 posts
Online
Hi,

I had a train from Meadowhall via Nunnery which I had to terminate in platform 8b (near end) instead of the usual P5.

When its next working came up, which was to Woodburn via Nunnery, the train was pointing Up and the Up (P8A) TRTS plunger was activated, necessitating the train to be manually reversed as it could not see the starter (running shunt 139-148-153-W224) as Off.

Thanks
Jamie

Jamie S (JAMS)
Last edited: 01/07/2024 at 18:43 by 9pN1SEAp
Reason: None given

Log in to reply
Starting at P8 02/07/2024 at 17:42 #157723
GeoffM
Avatar
6376 posts
Online
A save would be useful.

Pedantic note: that routing does not have any "running" shunts. All routes are signal-to-signal.

SimSig Boss
Log in to reply
Starting at P8 11/07/2024 at 20:12 #157800
Mikehax
Avatar
32 posts
In reality, Northbound (Down) departures are only allowed from P8 (and P6) at Sheffield in an emergency, usually as a result of a failure.
Having to re-platform an inbound service does not constitute an emergency and hence in the real world it would be necessary to shunt (via the south end) from P8 to P1, P2 or P5 to start the northbound service from a main aspect signal.

Last edited: 11/07/2024 at 20:13 by Mikehax
Reason: None given

Log in to reply
The following user said thank you: Meld