Upcoming Games

No games to display

Full list
Add a game

Upcoming Events

No events to display

Thoresby Colliery Jn Arr/Dep Roads

You are here: Home > Forum > Simulations > Released > Worksop > Thoresby Colliery Jn Arr/Dep Roads

Page 1 of 1

Thoresby Colliery Jn Arr/Dep Roads 28/03/2011 at 22:48 #2699
BarryM
Avatar
2158 posts
Further to posts mentioned in the Timetable section, I found that the stopping location in road 2 for an engine to detach is incorrect as the train is still blocking the junction. Abandoning the timetable, results in the train moving in and clearing the junction. I noticed there was no problem with road 1.
Barry

Barry, Sydney, New South Wales, Australia
Log in to reply
Thoresby Colliery Jn Arr/Dep Roads 28/03/2011 at 22:48 #14505
BarryM
Avatar
2158 posts
Further to posts mentioned in the Timetable section, I found that the stopping location in road 2 for an engine to detach is incorrect as the train is still blocking the junction. Abandoning the timetable, results in the train moving in and clearing the junction. I noticed there was no problem with road 1.
Barry

Barry, Sydney, New South Wales, Australia
Log in to reply
Thoresby Colliery Jn Arr/Dep Roads 28/03/2011 at 22:55 #14506
Noisynoel
Avatar
989 posts
That'll be because No 2 road is shorter. All the run rounds in the supplied TT need to be done in No 1 road
Noisynoel
Log in to reply
Thoresby Colliery Jn Arr/Dep Roads 28/03/2011 at 23:11 #14507
UKTrainMan
Avatar
1803 posts
If you'd like to, you can see this Google maps link (Satellite view) to see the actual arr/dep roads.
Any views and / or opinions expressed by myself are from me personally and do not represent those of any company I either work for or am a consultant for.
Log in to reply
Thoresby Colliery Jn Arr/Dep Roads 29/03/2011 at 23:12 #14556
Hpotter
Avatar
205 posts
Noted the above, having ammended the WTT with location as 'FX', will amend soon for the upload section.
Log in to reply
Thoresby Colliery Jn Arr/Dep Roads 12/07/2011 at 15:29 #17548
monkshood
Avatar
13 posts
Hi chaps,

I have an issue with Thoresby Colliery 4K57. When I pull in to line 1 the 0K57 loco decouples and I can get it to run around. However, when I try to re-couple 0K57 on the other end of 4K57, 0K57 reports that there is a train in front and the coupling doesn't happen. Even if I muck around reversing and shunting I get no joy. I eventually stopped the decouple by abandoning the timetable and pushed 4K57 into the colliery.

Can anyone tell me why 0K57 wouldn't couple to 4K57?

Ta.

Log in to reply
Thoresby Colliery Jn Arr/Dep Roads 12/07/2011 at 16:44 #17549
AndyG
Avatar
1842 posts
See post #7 in this thread.
I can only help one person a day. Today's not your day. Tomorrow doesn't look too good either.
Log in to reply