Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Edinburgh Callon does not prove before clearing.

You are here: Home > Forum > Simulations > Released > Edinburgh > Edinburgh Callon does not prove before clearing.

Page 1 of 1

Edinburgh Callon does not prove before clearing. 17/02/2012 at 03:41 #29613
Jsun
Avatar
212 posts
I have a wrong side failure at Edinburgh.

The attached picture depicts 0G00 about to advance on a subsidiary route onto line X from P13. The signal has cleared and the route has been set for over 20 seconds at this point.

I have yet to let the train proceed down the line but let's hope our hero is proceeding on sight and spots the points set against him.

Post has attachments. Log in to view them.
Log in to reply
Re: Edinburgh Callon does not prove before clearing. 17/02/2012 at 03:58 #29614
Jsun
Avatar
212 posts
The train runs out of track before reaching the tunnel.
Log in to reply
Re: Edinburgh Callon does not prove before clearing. 17/02/2012 at 06:36 #29616
Peter Bennet
Avatar
5402 posts
fixed- thanks

Peter

I identify as half man half biscuit - crumbs!
Log in to reply