Page 1 of 1
Kings Cross 2nd train overlength 17/01/2010 at 17:02 #554 | |
northroad
872 posts |
Can anyone asist please. I am currently running the Kings Cross 1985 7.21 along with Kurts add on number one. A mammoth timetable of over 1300 trains. I have a problem that I have never encountered before in that I have got the warning about the 2nd train overkength for Platform 10. 2R401 05:25 from Royston is sitting in Platform 10 awaiting the arrival of the 2R411 05:55 from Royston to join with it and form 2R02 07:07 Kings Cross to Royston. I have managed to get 2R411 as far as signal 292 the entrance to Gasworks tunnel but do not know how to get it any further. Is it something to do with the yellow arrowhead symbol that has appeared in the screen at Copenhagen tunnel just above the Up Slow Line. I have looked in the Wiki and it alerts you to the fact that this is telling me the trains combined will be overlength but do I need to do something with the timetable to get past this point Any suggestions please. Geoff Log in to reply |
Kings Cross 2nd train overlength 17/01/2010 at 17:02 #5944 | |
northroad
872 posts |
Can anyone asist please. I am currently running the Kings Cross 1985 7.21 along with Kurts add on number one. A mammoth timetable of over 1300 trains. I have a problem that I have never encountered before in that I have got the warning about the 2nd train overkength for Platform 10. 2R401 05:25 from Royston is sitting in Platform 10 awaiting the arrival of the 2R411 05:55 from Royston to join with it and form 2R02 07:07 Kings Cross to Royston. I have managed to get 2R411 as far as signal 292 the entrance to Gasworks tunnel but do not know how to get it any further. Is it something to do with the yellow arrowhead symbol that has appeared in the screen at Copenhagen tunnel just above the Up Slow Line. I have looked in the Wiki and it alerts you to the fact that this is telling me the trains combined will be overlength but do I need to do something with the timetable to get past this point Any suggestions please. Geoff Log in to reply |
Kings Cross 2nd train overlength 17/01/2010 at 18:01 #5948 | |
AndyG
1842 posts |
Set the route, and authorise the driver to pass signal at danger when he calls you.
I can only help one person a day. Today's not your day. Tomorrow doesn't look too good either. Log in to reply |
Kings Cross 2nd train overlength 17/01/2010 at 18:06 #5949 | |
TRC666
135 posts |
Have you tried using 'Shunt Forward' in the train list once 2R411 comes to a stop at signal 292? I think that might work.
Log in to reply |
Kings Cross 2nd train overlength 17/01/2010 at 20:43 #5951 | |
Peter Bennet
5402 posts |
Looking at the code I have for KX and S292 (which may not be the latest) there did seem to be an error in it. Have reported on the bugboard. Peter I identify as half man half biscuit - crumbs! Log in to reply |
Kings Cross 2nd train overlength 18/01/2010 at 12:11 #5955 | |
northroad
872 posts |
Thank you for your help guys....as usual it is most appreciated
Log in to reply |
Kings Cross 2nd train overlength 18/01/2010 at 17:20 #5959 | |
northroad
872 posts |
Andy, Ran it through again tonight and I had the same problem however followed your advice and authorised the driver to pass the signal......He followed my every wish. Thanks again but did I get penalties for that little move???? Geoff Log in to reply |
Kings Cross 2nd train overlength 18/01/2010 at 18:09 #5960 | |
AndyG
1842 posts |
Shouldn't get a penalty as far as I'm aware.
I can only help one person a day. Today's not your day. Tomorrow doesn't look too good either. Log in to reply |