Page 1 of 1
Signalling a route from Thoresby Colliery to Welbeck Colliery. 04/11/2014 at 14:04 #65460 | |
Northernboy67
21 posts |
I have almost got the hang of the sim now, and really enjoying. One slight problem. I forget which timetable I'm using, but I have attachments here. I am trying toset a route from Thoresby Colliery to Welbeck Colliery. As the timetable says. A little help is required, as I can't see the run round at Welbeck Colliery, in order to complete the task. I can't see anything in the Worksop simulation manual. Post has attachments. Log in to view them. Log in to reply |
Signalling a route from Thoresby Colliery to Welbeck Colliery. 04/11/2014 at 14:27 #65461 | |
peterb
452 posts |
I'm not sure the timetable is correct for 4E42 or 0E42-1. 4E42 returns from Thoresby Colliery back towards Shirebrook. To get to Welbeck it needs to reverse first at Welbeck Colliery Jn C332, then again at C233 and the timetable should reflect this. If a second run round is required; i.e. the train should reverse into the Colliery with the engine at the back, then the RR takes place at signal 221. However the timetable for the RR loco (0E42-1) is also incorrect since 'Welbeck RR C322 Rev' should be the second location on the timetable and 'Welbeck Colliery Jn Loco Siding' the fourth. Log in to reply |
Signalling a route from Thoresby Colliery to Welbeck Colliery. 04/11/2014 at 14:43 #65462 | |
Steamer
3997 posts |
" said:Welbeck Colliery run-round is the loop between the entrance to Welbeck Colliery and the loco siding. "Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q) Log in to reply |