Upcoming Games

No games to display

Full list
Add a game

Upcoming Events

No events to display

Minor edit needed to manual

You are here: Home > Forum > Simulations > Released > Leamington Spa > Minor edit needed to manual

Page 1 of 1

Minor edit needed to manual 13/11/2015 at 13:12 #77658
outofsection
Avatar
149 posts
Asa regular user of this line, an update is needed to the Wiki.

I'd do this myself if I had the experience and could access the editing page for the manual, but in the Leamington manual I suggest amending the info regarding the Field Sidings just north of Leamington station to read:-

The Field Sidings are in reality out of use and whilst still in place, they are heavily overgrown and the connecting pointwork to the Up Main has been removed, leaving them isolated from the rail network. They are included in the simulation as they are still present within the interlockings, and at the dates of the simulated eras they were still connected, with all of the associated infrastructure also being present.


Hope this is of some use. About every two months I travel the line from High Wycombe to B'ham Moor St, so I can update the Wiki if I spot any changes - the next of which I'm expecting to be the elimination of Banbury North & South boxes along with their mechanical signalling.

Log in to reply
Minor edit needed to manual 13/11/2015 at 20:39 #77667
Stephen Fulcher
Avatar
2088 posts
At the time of both simulation eras, the pointwork was still in place and the sidings were nowhere near as overgrown as they are today.
Log in to reply
Minor edit needed to manual 14/11/2015 at 10:59 #77680
outofsection
Avatar
149 posts
Indeed it was, there is no disputing that fact or criticism of anyone's work - far from it, but as of 2015, the pointwork has been removed, so all I'm doing is asking for a small update to be added to the manual to reflect that fact.

Sorry for any offence.

Log in to reply