York IECC 1991. 24/04/2016 at 22:09 #81988
ozrail
Avatar
197 posts
Flooding of the tracks issues and ARS problem at end of video.

https://youtu.be/eoFc4_T-Sns

Log in to reply
The following user said thank you: LMK
York IECC 1991. 25/04/2016 at 11:36 #81993
Jersey_Mike
Avatar
250 posts
Man, look at those primitive graphics. So glad they've been updated in the 25 years since.
Log in to reply
York IECC 1991. 25/04/2016 at 12:25 #81994
flabberdacks
Avatar
636 posts
Glad to see ARS was working its excellent magic even then!
Log in to reply
York IECC 1991. 25/04/2016 at 15:41 #81996
GeoffM
Avatar
6376 posts
" said:
Man, look at those primitive graphics. So glad they've been updated in the 25 years since.
Indeed they were - at least twice. New graphics cards in the early 1990s (the original hardware was not COTS due to the general unavailability of the required resolution in those days), and new software at the same time. Another major upgrade in the late 1990s, another in the 2000s, and now IECC Scaleable which - if I understand correctly - will be installed when York IECC moves to York ROC later this year.

But nobody needs fancy 3d graphics with 2m colours for railway signalling, do they?

SimSig Boss
Log in to reply
York IECC 1991. 25/04/2016 at 16:53 #81998
Jersey_Mike
Avatar
250 posts
" said:

Indeed they were - at least twice. New graphics cards in the early 1990s (the original hardware was not COTS due to the general unavailability of the required resolution in those days), and new software at the same time. Another major upgrade in the late 1990s, another in the 2000s, and now IECC Scaleable which - if I understand correctly - will be installed when York IECC moves to York ROC later this year.

But nobody needs fancy 3d graphics with 2m colours for railway signalling, do they?
Well it's nice to have fonts and VGA colors.

https://www.acm.jhu.edu//~sthurmovik/Railpics/13-05-11_SEPTA_CONTROL/SEPTA_1234-Control-Room-RRD-Big-Board-R1-R3-R8.html

Also, whatever 3D graphics they used on that Leeds machine are top notch. The buttons look like they are coming right out of the panel!

Last edited: 25/04/2016 at 16:56 by Jersey_Mike
Log in to reply
York IECC 1991. 25/04/2016 at 18:06 #81999
GeoffM
Avatar
6376 posts
" said:
Well it's nice to have fonts and VGA colors.
VGA first came out in 1987 but that was probably too late for an Easter 1989 release of safety related hardware. Remember that the UK requires the signaller to be able to see the railway at all times, no more than a few seconds behind, for safety reasons. I understand the US has no such requirement to do this.

As for fonts: that is what you're seeing on the screen, the shapes that make letters, digits, and track elements. :doh

VGA colours: 16 AIUI on VGA initially. This is all that is required for safety related applications, and indeed IECC uses about a dozen of those IIRC.


" said:
https://www.acm.jhu.edu//~sthurmovik/Railpics/13-05-11_SEPTA_CONTROL/SEPTA_1234-Control-Room-RRD-Big-Board-R1-R3-R8.html
Interesting but you're simply proving my point. That picture only has around 8 colours - and would fail the readability requirement in the UK. I don't mean picture quality, or overviews, but the font size as evidenced on other photos in that album.


" said:
Also, whatever 3D graphics they used on that Leeds machine are top notch. The buttons look like they are coming right out of the panel!
<Shrug> Some people prefer trackerballs and physical buttons. Some people like big levers and tea towels. Some people prefer PC mice. Horses for courses.

SimSig Boss
Last edited: 25/04/2016 at 18:08 by GeoffM
Log in to reply
York IECC 1991. 25/04/2016 at 18:56 #82000
jc92
Avatar
3685 posts
" said:
Also, whatever 3D graphics they used on that Leeds machine are top notch. The buttons look like they are coming right out of the panel!
<Shrug> Some people prefer trackerballs and physical buttons. Some people like big levers and tea towels. Some people prefer PC mice. Horses for courses.[/quote]

But everyone universally requires kettle based refreshment equipment! (Comes as standard on all models of box).

"We don't stop camborne wednesdays"
Log in to reply
York IECC 1991. 26/04/2016 at 07:56 #82001
kbarber
Avatar
1742 posts
" said:


<Shrug> Some people prefer trackerballs and physical buttons. Some people like big levers and tea towels...

And a nice solid bell & tapper to communicate, with a decent bit of furniture to contain the indicators https://www.google.co.uk/imgres?imgurl=http%3A%2F%2Fwww.roscalen.com%2Fsignals%2FStAlbans%2F110710%2FBlocks2.jpg&imgrefurl=http%3A%2F%2Fwww.roscalen.com%2Fsignals%2FStAlbans%2Findex.htm&docid=8pWiW1gibR9k8M&tbnid=bM_6zJnmR9BJNM%3A&w=800&h=541&bih=930&biw=1280&ved=0ahUKEwiIz43r6avMAhVEOBQKHczoAWc4rAIQMwgMKAkwCQ&iact=mrc&uact=8 (we'll draw a veil over the weedy plastic substitutes).

Log in to reply