Page 1 of 1
Y201 23/06/2016 at 19:04 #83172 | |
6691donn
9 posts |
I could be wrong so dont shot me down straight away but Y201 controls movements from Down Leeds to Holgate sidings and also the Down Leeds. Now in the Sim its not approach controlled however I believe that it is. Having signed the route you go from a line speed of 60mph down to 25mph with no warning boards. Is this a bug?? More of a player then a poster. TPD Log in to reply |
Y201 23/06/2016 at 20:27 #83173 | |
GeoffM
6376 posts |
Looks like it, will verify the correct conditions shortly. Mantis 15444.
SimSig Boss Log in to reply The following user said thank you: 6691donn |
Y201 30/06/2016 at 12:25 #83307 | |
Chrisrail
384 posts |
Y201 is only approach controlled if the route is set into Holgate Loop / Sidings. Spoken with York SSM today
Log in to reply |