Upcoming Games

No games to display

Full list
Add a game

Upcoming Events

No events to display

CCW17 and Collington Station

You are here: Home > Forum > Simulations > Released > East Coastway > CCW17 and Collington Station

Page 1 of 1

CCW17 and Collington Station 11/05/2017 at 14:22 #95032
Gwasanaethau
Avatar
509 posts
Hi all,

Here’s another potential bug that I’m not sure has been mentioned. Down trains arrive and depart from Collington station before passing CCW17 (Down Distant for Bexhill) despite CCW17 being placed in advance of the station on the sim layout.

Tschüß!

Mark (Gwasanaethau)

Log in to reply
CCW17 and Collington Station 11/05/2017 at 17:05 #95039
GW43125
Avatar
495 posts
Gwasanaethau in post 95032 said:
Hi all,

Here’s another potential bug that I’m not sure has been mentioned. Down trains arrive and depart from Collington station before passing CCW17 (Down Distant for Bexhill) despite CCW17 being placed in advance of the station on the sim layout.
Just going to be pedantic, the station is in advance of the signal, the signal is in rear of the station.

Log in to reply
The following user said thank you: Gwasanaethau
CCW17 and Collington Station 11/05/2017 at 20:24 #95045
DriverCurran
Avatar
695 posts
Mark,

This is how it is designed. The message about passing the signal is given when the first track circuit shows occupied, in most cases this is a virtual track circuit to recreate the signalman actually having visual sight of the train, at which point he could then replace the distant signal to caution.

Paul

You have to get a red before you can get any other colour
Log in to reply
The following user said thank you: Gwasanaethau
CCW17 and Collington Station 11/05/2017 at 22:21 #95049
Gwasanaethau
Avatar
509 posts
GW43125 in post 95039 said:

Just going to be pedantic, the station is in advance of the signal, the signal is in rear of the station.
Ah! Thanks – knew I’d get it the wrong way around!

DriverCurran in post 95045 said:
Mark,

This is how it is designed. The message about passing the signal is given when the first track circuit shows occupied, in most cases this is a virtual track circuit to recreate the signalman actually having visual sight of the train, at which point he could then replace the distant signal to caution.

Paul

Ah! That makes sense. At the point that the signaller can see the train (the point where the message appears) it has actually travelled a fair distance from the point at which it passed the distant signal…

Thank you both for the clarifications!

Mark.

Log in to reply