Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Delayed at signal 2

You are here: Home > Forum > Simulations > Released > Wembley Suburban > Delayed at signal 2

Page 1 of 1

Delayed at signal 2 18/09/2010 at 08:31 #1785
jrr
Avatar
95 posts
2C05 came to a halt at signal 2 complaining of a red signal (which displays grey unless overriden). Since (a) trains had already gone that way and (b) I had not operated the override on that signal I let it wait. 30 mins later I told it to pass the red (with due caution etc...) on to WM 204 which it happily went straight past. 2C06 now close behind also came to a halt at the same signal (2C05 had vanished). I had no signal or TC failure message. Is this a normal confusion at signalling area boundaries or something odd?
Log in to reply
Delayed at signal 2 18/09/2010 at 08:31 #11572
jrr
Avatar
95 posts
2C05 came to a halt at signal 2 complaining of a red signal (which displays grey unless overriden). Since (a) trains had already gone that way and (b) I had not operated the override on that signal I let it wait. 30 mins later I told it to pass the red (with due caution etc...) on to WM 204 which it happily went straight past. 2C06 now close behind also came to a halt at the same signal (2C05 had vanished). I had no signal or TC failure message. Is this a normal confusion at signalling area boundaries or something odd?
Log in to reply
Delayed at signal 2 18/09/2010 at 10:16 #11573
AndyG
Avatar
1842 posts
Post deleted
I can only help one person a day. Today's not your day. Tomorrow doesn't look too good either.
Log in to reply