Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Who's Online

era

You are here: Home > Forum > Simulations > Released > Oxted > era

Page 1 of 1

era 30/04/2012 at 19:04 #32007
alan_s
Avatar
152 posts
Sorry, another question, according to the wiki there are two eras for oxted - before or after the spa valley railway extension to eridge. However I can't see how to set this. Under simulation options all I see is the level (beginner etc) and the chances of TSRs.

Regards
Alan

Log in to reply
Re: era 30/04/2012 at 19:11 #32008
jc92
Avatar
3685 posts
at present theres no difference, and in practice there isnt! the spa valley operates completely seperate from the network and the shared LC is a red/green crossing. the spa valley assign a crossing attendant.

i beleive its been suggested at some point the spa valley could be added for additional amusement however...

"We don't stop camborne wednesdays"
Log in to reply
The following user said thank you: alan_s
Re: era 30/04/2012 at 20:29 #32012
alan_s
Avatar
152 posts
OK thanks
Log in to reply
Re: era 30/04/2012 at 23:45 #32021
DriverCurran
Avatar
688 posts
Hi Alan,

Glad you to see another user to my first simulation. I have currently got a version of the sim with my testers that incorporates the Spa Valley line, with a small bit of user interaction on the part of the 'signaller' involving a ground frame at Eridge.

As jc92 has already said the operation of the Eridge extension of the SVR is self contained apart from a request to the signaller at Oxted to allow the appointed person to open the access gate to the former down line formation.

Paul

You have to get a red before you can get any other colour
Log in to reply
The following user said thank you: alan_s