Taking your complaint to the next level 03/05/2012 at 20:58 #32089
pbinnersley
Avatar
431 posts
I saw this item on the Railway Eye blog.

I hope they post the reply.

Peter.

Log in to reply
Re: Taking your complaint to the next level 03/05/2012 at 21:04 #32092
Peter Bennet
Avatar
5375 posts
Online
The man who sued God.

Peter

I identify as half man half biscuit - crumbs!
Log in to reply
Re: Taking your complaint to the next level 03/05/2012 at 21:21 #32097
GoodbyeMrFish
Avatar
148 posts
It's impressive that they got things running again so quick, the damage looks a right old mess. A testiment to the enginners.
Log in to reply
Re: Taking your complaint to the next level 03/05/2012 at 23:18 #32105
mfcooper
Avatar
707 posts
Essentially, the building that was hit was a substation, supplying power to equipment (and 3rd rail?) across a wide area including railway from Waterloo and Victoria (eastern). The temporary fix is to feed the power supply from the neighbouring substations to cover for the damaged one. The last I heard, it will take 4 months to repair the damage...

Let's just hope an adjacent substation isn't taken out in the meantime....

Log in to reply
Re: Taking your complaint to the next level 04/05/2012 at 07:47 #32107
moonraker
Avatar
353 posts
Wow that's quite some damage looking at the picture :blink: . I can remember the Traincrew accomodation block at Oxford being struck once whilst in the messroom and that knocked everything out for a good while
Last edited: 04/05/2012 at 11:02 by moonraker