Page 1 of 1
Down Trowbridge Siding 03/03/2013 at 19:36 #42012 | |
DaveHarries
![]() 1294 posts |
Hi, In the Reading Blockade (Weekday) TT I am working on I need to put two trains arriving at Westbury into sidings for a layover. I plan on putting 1 train into the Down Trowbridge Siding and one into the Westbury Engine Sidings. In order to make the task easier, what is the maximum length of train that can be accommodated into the Down Trowbridge Siding? Thanks, Dave Log in to reply |
Down Trowbridge Siding 03/03/2013 at 19:53 #42013 | |
Underwood
![]() 748 posts |
Just done a test and you can fit 67 meters in, so basically a Class 150/9, 158/9 or a 150 and 153
Log in to reply |
Down Trowbridge Siding 03/03/2013 at 19:57 #42014 | |
dwelham313
![]() 139 posts |
Underwood beat me too it! I Managed to get a 68m train in. A 3-car 165 is 70.5m long Dave!
Log in to reply |
Down Trowbridge Siding 03/03/2013 at 20:18 #42015 | |
AndyG
![]() 1857 posts |
The TC is shown as 70m long, just depends how tight to the buffers the train can get in SimSigland.
I can only help one person a day. Today's not your day. Tomorrow doesn't look too good either. Log in to reply |
Down Trowbridge Siding 03/03/2013 at 21:17 #42017 | |
DaveHarries
![]() 1294 posts |
Thank you for your help guys. Dave Log in to reply |