Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Who's Online

Down Trowbridge Siding

You are here: Home > Forum > Simulations > Released > Westbury > Down Trowbridge Siding

Page 1 of 1

Down Trowbridge Siding 03/03/2013 at 19:36 #42012
DaveHarries
Avatar
1285 posts
Hi,

In the Reading Blockade (Weekday) TT I am working on I need to put two trains arriving at Westbury into sidings for a layover. I plan on putting 1 train into the Down Trowbridge Siding and one into the Westbury Engine Sidings.

In order to make the task easier, what is the maximum length of train that can be accommodated into the Down Trowbridge Siding?

Thanks,
Dave

Log in to reply
Down Trowbridge Siding 03/03/2013 at 19:53 #42013
Underwood
Avatar
748 posts
Just done a test and you can fit 67 meters in, so basically a Class 150/9, 158/9 or a 150 and 153
Log in to reply
Down Trowbridge Siding 03/03/2013 at 19:57 #42014
dwelham313
Avatar
139 posts
Underwood beat me too it! I Managed to get a 68m train in. A 3-car 165 is 70.5m long Dave!
Log in to reply
Down Trowbridge Siding 03/03/2013 at 20:18 #42015
AndyG
Avatar
1842 posts
The TC is shown as 70m long, just depends how tight to the buffers the train can get in SimSigland.
I can only help one person a day. Today's not your day. Tomorrow doesn't look too good either.
Log in to reply
Down Trowbridge Siding 03/03/2013 at 21:17 #42017
DaveHarries
Avatar
1285 posts
Thank you for your help guys.

Dave

Log in to reply