Page 1 of 1
TVSC Reading workstation 16/04/2013 at 14:08 #43566 | |
John
884 posts |
I want to play.... Would prefer without all the TCF's, though. Photograph copyright Danny Scroggins Last edited: 16/04/2013 at 14:15 by John Log in to reply |
TVSC Reading workstation 16/04/2013 at 16:46 #43569 | |
jwsetford
164 posts |
Reminds me of when all the track circuits in the slough new signalling area failed. Only a few delays
Last edited: 16/04/2013 at 16:46 by jwsetford Log in to reply |
TVSC Reading workstation 16/04/2013 at 16:59 #43570 | |
jc92
3685 posts |
"track circuit failure detected in the reading area"
"We don't stop camborne wednesdays" Log in to reply The following user said thank you: guidomcc |
TVSC Reading workstation 16/04/2013 at 17:39 #43571 | |
jwsetford
164 posts |
do you mean 'x460 track circuit failure(s) detected in reading area'
Log in to reply |
TVSC Reading workstation 16/04/2013 at 20:43 #43589 | |
TomOF
452 posts |
The workstation hadn't yet been connected to the interlockings, hence the apparent mass failures.
Log in to reply |
TVSC Reading workstation 17/04/2013 at 08:57 #43595 | |
moonraker
370 posts |
Was this when the recent blockade was taking place ?
Log in to reply |
TVSC Reading workstation 19/04/2013 at 00:38 #43692 | |
UKTrainMan
1803 posts |
Worst. Shift. Ever. TCFs everywhere. *off to curl up in that dark corner at the back of the 'box and cry/sob/wail* Any views and / or opinions expressed by myself are from me personally and do not represent those of any company I either work for or am a consultant for. Log in to reply |