Swindon - Kemble redoubling. 30/08/2013 at 14:59 #49013
danheathorguk
Avatar
9 posts
Is it possible for the sim to be updated to include the redoubling at some point?
I know there have been new signals installed too and chances are a new timetable will have to be written or the existing ones modified.

What are the chances of this happening and the sim being re-released with this update?

Log in to reply
The following user said thank you: albie vowles
Swindon - Kemble redoubling. 30/08/2013 at 18:05 #49015
JamesN
Avatar
1607 posts
It doesn't get comissioned until Easter!
Log in to reply
Swindon - Kemble redoubling. 30/08/2013 at 18:06 #49016
danheathorguk
Avatar
9 posts
True - but it might take until Easter to get an update out :whistle:
Log in to reply
Swindon - Kemble redoubling. 30/08/2013 at 18:20 #49019
Peter Bennet
Avatar
5402 posts
Can you supply the re signalling plans? If so it's probably not take very long to do, if not then it'll take rather longer.

Peter

I identify as half man half biscuit - crumbs!
Log in to reply
The following user said thank you: danheathorguk
Swindon - Kemble redoubling. 30/08/2013 at 18:28 #49020
danheathorguk
Avatar
9 posts
Would be nice for this. NR Open rail data project doesn't quite reach signalling systems I don't think, and to be honest, I hope it never does. The sectional appendix is enough.

I should say, thanks for the great sim and when I have enough free cash then I'm looking at the paid sims

Log in to reply
The following user said thank you: albie vowles
Swindon - Kemble redoubling. 30/08/2013 at 18:50 #49021
tjfrancis
Avatar
359 posts
wil this do peter
http://www.networkrail.co.uk/browse%20documents/sectional%20appendix/western%20sectional%20appendix.pdf

I am dyslexic so please consider this when reading my posts
Log in to reply
Swindon - Kemble redoubling. 30/08/2013 at 18:57 #49022
fsxfaulder
Avatar
77 posts
Think that should be titled "The Whole of Network Rail in a PDF"
Log in to reply
Swindon - Kemble redoubling. 30/08/2013 at 19:02 #49023
Peter Bennet
Avatar
5402 posts
Thanks, it's useful (though at the moment the double track is not included) for speeds but not TC breaks and signals etc.

Peter

I identify as half man half biscuit - crumbs!
Last edited: 30/08/2013 at 19:04 by Peter Bennet
Reason: typo

Log in to reply
Swindon - Kemble redoubling. 31/08/2013 at 10:11 #49034
tjfrancis
Avatar
359 posts
you welcome peter
I am dyslexic so please consider this when reading my posts
Log in to reply
Swindon - Kemble redoubling. 01/09/2013 at 15:50 #49077
duncan89
Avatar
9 posts
They've closed the line at the moment - I live in Stroud not far away and its a pain getting to london - buses between kemble and Swindon :-(
Log in to reply
Swindon - Kemble redoubling. 01/09/2013 at 18:37 #49082
danheathorguk
Avatar
9 posts
Same - I run from SHU to PAD.

The line closure though has been nice as its allowed a very good reason to work from home! (or get everything done quick and then SimSig as it may have turned out to be)

Log in to reply
Swindon - Kemble redoubling. 01/09/2013 at 18:53 #49083
moonraker
Avatar
370 posts
I remember when it was singled around 1974 I think. Daft really when the rest of the Golden Valley route is double line throughout. Much the same as the North Cotswolds which is being similarly redoubled along most of its length.
Log in to reply
The following user said thank you: albie vowles
Swindon - Kemble redoubling. 02/09/2013 at 10:24 #49093
danheathorguk
Avatar
9 posts
I would like to know why just that stretch was singled. I would understand more if it was single from Stroud (or even Standish Jn) to Swindon, with a passing loop at Kemble - would make more sense than just the section that was singled.
Log in to reply
Swindon - Kemble redoubling. 02/09/2013 at 10:48 #49095
moonraker
Avatar
370 posts
The $64,000,000 question. Like so many of the cost cutting exercises of the 60's and 70's it left a lot to be desired :dry:
Log in to reply
Swindon - Kemble redoubling. 02/09/2013 at 10:52 #49097
danheathorguk
Avatar
9 posts
I'm too young to be around for the cuts - have any documents related to them been released? Such as, the why's and any minutes from meetings re the cuts. Would be interesting to hear from an official ministry position why just that section was decided.

I will be back on that line tomorrow, look forward to having a peek at the work as I go past.

Log in to reply
Swindon - Kemble redoubling. 02/09/2013 at 11:22 #49099
Peter Bennet
Avatar
5402 posts
" said:
I'm too young to be around for the cuts - have any documents related to them been released? Such as, the why's and any minutes from meetings re the cuts. Would be interesting to hear from an official ministry position why just that section was decided.

I will be back on that line tomorrow, look forward to having a peek at the work as I go past.
Try National Archives in Kew, they hold copies of old WTTs and the like - so maybe also BR board decisions - if that was what it was.

Peter

I identify as half man half biscuit - crumbs!
Log in to reply
Swindon - Kemble redoubling. 02/09/2013 at 12:40 #49101
moonraker
Avatar
370 posts
The line was actually singled in summer 1968. The NRO website is a little tricky to find anything official but it was part of the rationalisation of the entire route after the closure of the Tetbury and Cirencester Town branches from Kemble. The actual proposal was to single the entire line between Standish Junction and Loco Yard (Swindon) Junction but a protest saw BR stop at the section between Swindon and Kemble which is why it was only that section. I remember from my school days going out on a trip to Purton Brick Works which had a crossing across the line and now I think about it I remember the men working there were removing semaphore signals so I'm guessing it was being converted to Colour Light around '74.
Last edited: 02/09/2013 at 12:43 by moonraker
Log in to reply
Swindon - Kemble redoubling. 02/09/2013 at 12:59 #49102
Steamer
Avatar
3984 posts
From the Swindon Panel Preservation website: Multiple Aspect Signalling- Swindon (Stage 7- Swindon Loco Yard- Kemble)
"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)
Log in to reply
Swindon - Kemble redoubling. 03/09/2013 at 09:05 #49118
moonraker
Avatar
370 posts
Quite possibly removing redundant stuff then from the dormant Down Line. There were definitely semaphores there though.