Failures fixed? 04/09/2013 at 19:10 #49141
Class 92
Avatar
359 posts
Has the problem with the failures not clearing after saving and quitting then restarting been fixed?
Log in to reply
Failures fixed? 01/10/2013 at 16:58 #49707
Dick
Avatar
387 posts
Not sure if I've missed it, but haven't seen an update on this. Getting quite a few TCFs stacking up on my current game now, have I just got to persevere with them or will they clear eventually on a saved game? The problem is I don't normally play for long enough between saves for them to clear before saving.
Log in to reply
Failures fixed? 03/10/2013 at 10:38 #49747
Dick
Avatar
387 posts
I'll take that as a 'no' then.
Log in to reply
Failures fixed? 03/10/2013 at 15:41 #49754
GeoffM
Avatar
6376 posts
Online
There was a partial fix, however a full fix is currently under test (released to testers late last week).
SimSig Boss
Log in to reply
The following user said thank you: Dick
Failures fixed? 03/10/2013 at 15:48 #49755
Dick
Avatar
387 posts
Thanks Geoff
Log in to reply
Failures fixed? 03/10/2013 at 18:16 #49762
Jan
Avatar
906 posts
In the meantime, you can clear the failures via the Incident Control Panel (F11).
Two million people attempt to use Birmingham's magnificent rail network every year, with just over a million of them managing to get further than Smethwick.
Log in to reply
Failures fixed? 03/10/2013 at 18:25 #49763
Dick
Avatar
387 posts
Thanks for the tip.
Log in to reply
Failures fixed? 18/12/2013 at 12:31 #52940
rwpenny
Avatar
2 posts
Can someone please explain how to do this? I've got a track circuit failure at Harrow locking up the Up Uxbridge line, which doesn't clear after saving and relaoding - it's been on for 4 hours during the night period. As the original incident report no longer appears after reloading, how do I find out the track circuit identificaton letters so I can deal with it in the F11 incident control panel?
Otherwise, it's a great simulation.

Log in to reply
Failures fixed? 18/12/2013 at 13:12 #52941
headshot119
Avatar
4869 posts
Open F11, go to track circuits, click the little mouse symbol, click the track circuit you want to toggle, this will highlight that track circuit in the list.
"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Log in to reply
Failures fixed? 18/12/2013 at 15:42 #52950
DriverCurran
Avatar
688 posts
It should of course be borne in mind that during the night hours that many of the signalling and telecommunications team depots actually shut at night, therefore attendance times will increase and that is also assuming that the available teams are not engaged on track renewals work.

Paul

You have to get a red before you can get any other colour
Log in to reply
Failures fixed? 18/12/2013 at 16:46 #52956
rwpenny
Avatar
2 posts
Is it still like that then? I thought when I retired and Network Rail took over that everything was going to be so much better. After all we old railwaymen were getting every thing wrong, weren't we? How disappointing!
Log in to reply